Construction Program of Digital project

Source: Internet
Author: User

About the construction of information project, I do see some books are introduced, but are management informatization projects.

Management Information Project implementation is relatively simple, mature technology, but also easy to implement, but the project information is different, there is a great technology sharing and management risk, so the implementation will be more cautious.

Summarize what I have done in the Project digitization Project construction process.

According to the general project process, I think the project experience: 1 Requirements Confirmation, 2 program stage, 3 implementation phase, 4 acceptance stage, 5 maintenance stage, major or special project will have 0 pre-research stage.

In addition to the maintenance phase, expert reviews are required at each stage. Requirements validation and review of the programme phase can be combined, but two reviews are required.

0 Pre-research stage

I have done a IPT project, because the project can draw on too little information, before the requirement confirmation phase, had to carry out a one-year pre-research phase, mainly out of feasibility report.

The feasibility demonstration report is the basis of the pre-research review.

1 Requirements Confirmation

The demand stage is mainly in the business unit and the manufacturer repeatedly investigates, determines the technical request. Sometimes the technical expression is complex, the technical requirement is the developer (Party B) drafted, but still must express in the tone of party A.

Technical requirements are the basis of the requirement confirmation review. Technical requirements are reported by party a review experts.

Technical requirements are the most easily overturned, I went through the meeting (the jury) demand was rejected, after all, the need for a person a view, each angle is different.

2 Programme phase

Project construction plan is generally completed by developers, and developers report review experts.

The project construction plan book is mainly to the standard technical request completes.

I do not agree with the fact that many people think that the construction plan is fully in line with the technical requirements.

Technical requirements are like the standard answer, the construction plan is similar to the examination paper, the examination papers are not necessarily full marks?!

So I usually write the technical Yaoqi in depth, even if the developers can not fully realize, but at least express the needs of the party, perhaps the future of technology can be achieved, right?

Sometimes technical requirements review and construction program review is carried out together, there are party A and party B report and answer questions, issued two expert opinion.

After the program review, business is generally started.

Of course, the solution might be to compare multiple vendors.

Because the development project customization and service requirements are very high, so different general merchandise procurement process, is not allowed.

After the completion of business, the general lending 40%. Of course, different people control the project funds, the proportion is also different.

The general technical requirement is the technical agreement in the contract.

3 Implementation Phase

The implementation phase is mainly the project team, that is, the two sides jointly completed.

There may be mid-term inspection in the middle, mainly to investigate the progress of the project.

The implementation of the general lending 40% was completed.

4 Acceptance phase

Although the acceptance phase is short, why should I separate it from the implementation phase?

Because I think this stage is the most important, because the acceptance is usually to do a trial run, or even formally run.

And then to complete a number of column documents, especially the technical Manual (function manual) is mainly for the software implementation of the input and output relationship of the principle of description, the use of manual is mainly based on the case of the operation process demonstration.

Some manufacturers provide a manual like a function manual, is to write a simple function introduction, it is difficult for users to understand.

The acceptance review material is mainly the project work report and the project technical report, respectively Party A and party B provides. There is also a bunch of documents.

Through the acceptance review, the lender last 20%.

5 Maintenance phase

After the general entry into the maintenance phase, the project enters the operation dimension period.

Usually by the operation and maintenance personnel gradually improve the Administrator's manual and user manual, the actual operation of the problems in the process of recording the relevant countermeasures.

As the project runs in depth, there will be new requirements, that is, you can start the second phase of construction ....

Construction Program of Digital project

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.