There are many areas worth learning about the internet cafe Integrated Wiring solution. Here we mainly introduce the acceptance of the Integrated Wiring of the Internet cafe power supply system, including the Integrated Wiring of the network system and the Integrated Wiring Design of the network system, I hope to help the internet cafe designers.

Internet cafe Power System Integrated Wiring acceptance
After the work of the Internet cafe Integrated Wiring Scheme for the Internet cafe power system is completed, acceptance must be carried out. In addition, after the Cabling Work is over, some pipelines and renovations will continue. If the power supply system is faulty after the renovation of the Internet cafe, the maintenance cost will be too high. Therefore, the acceptance of the Integrated Wiring of the Internet cafe power system is not sloppy. The acceptance of Power wiring generally includes the following aspects:
1. Test whether all devices are working properly: After the internet cafe power cabling is completed, you must test whether each line and each air switch can work properly. If the line is abnormal during the acceptance process, I suggest replacing it instead of repairing it. It is difficult to repair the line after the internet cafe is decorated.

2. Full load operation of Internet cafes: after the first step of the test is run, the devices in the Internet cafes are opened in batches, and the full load power of Internet cafes is gradually achieved. It is best to run the whole load for more than 24 hours, so as to test the real performance of the Power wiring system. During full load operation, if the air switch is automatically tripped or the fuse is burned out, check the cause carefully.

3. overload operation in Internet cafes: after full load operation, you can perform overload operation for a short period of time to check the quality and compression performance of the power supply system. The overload operation can take about 10 hours. You can choose a different test time based on the actual situation.

The Integrated Wiring of the Internet cafe power system is higher than that of any business place. It is best for Internet cafe operators to find professional electricians or professional Internet cafe Integrated Wiring solution personnel to access the Integrated Wiring of the Internet cafe power system, and record the cabling files, the scope and direction of each power cord must be recorded in the document to facilitate future maintenance.

Integrated Network System cabling
The Integrated Wiring of the Internet cafe network system is relatively complex. After all, each machine requires a network cable to connect to it, and the network wiring also involves the placement design of switches, routers, and other network devices. Like the Integrated Wiring of Power Systems, the Integrated Wiring of network systems is also divided into three processes: Design, Construction and acceptance.

Network System Integrated Wiring Design
The integrated network cabling solution for each Internet cafe is not the same, because the network cabling of the Internet cafe must be restricted by the terrain of the Internet cafe's business premises and the placement of network devices such as switches. The network structure of all Internet cafes is the network mode of routers, primary switches, Branch switches, and clients. The network wiring design should also be based on this basic network structure.

1. Determine the installation location of the branch switch: the twisted pair wires connect the client to the switch. because the number of ports of the switch is limited, each switch can only serve a certain number of computers. Currently, 24-port switches are the most cost-effective switches for Internet cafes. 48-port switches are not widely used because of their high prices.
Because the maximum transmission distance of twisted pair wires is 100 meters, you must ensure that the distance from the switch to each computer is within 100 meters when selecting the installation location of the branch switch. To save the network cable, you can install the switch in the center of the 24 computers. Because the switch requires a certain amount of heat during operation, the installation position of the switch should also maintain good ventilation performance, and it should be easy to maintain the switch. For Internet cafes with relatively small business areas, you can place switches in specialized cabinets without looking for installation positions for each switch.

2. Determine the router installation location: the Internet cafe network is a layered structure. The router can be seen as a network convergence layer. All data must be aggregated here and forwarded out. A vro is also an expensive network device that has strict requirements on the working environment. Therefore, it is best to install the vro in the data center and ensure that the vro has good ventilation performance.

3. determine the direction of the twisted pair: After the installation location of the router and switch is determined, the next step is to design a direction for the twisted pair. Because twisted pair Wires transmit network signals, electromagnetic signals will interfere with signal transmission quality. Therefore, the trend of twisted pair wires should be kept away from the power cord to avoid passing through high-power appliances such as air conditioners.

When designing the internet cafe Integrated Wiring Scheme, pay attention to the fact that, because the branch switch and the main switch are cascade, a 24-port switch can only provide access services for 22 computers. In addition, note that all Branch switches are directly connected to the trunk switch, instead of connecting the trunk switch to the trunk switch after the branches are connected in series.


  1. Smart Community Integrated Wiring System Perfect solution
  2. Performance service for online tracing products launched by the US
  3. Analysis on the integrated cabling system of the company
  4. Integrated Wiring System Standard learning notes
  5. The Integrated Wiring market is "competing for better ideas"

Related Article

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.