Owners choose a strong company to undertake the project, the choice is not the company's reputation, nor is not the lowest price, but high-quality reliable system services.
  
For the integrated wiring system, the embodiment is the project, not the material. Because users are buying more than just Lucent. The amp or other manufacturer's cables, connectors, and should be the entire system. Therefore, it is important to choose what products, but it is more important to install and debug the construction and service of these products.
  
  
1. Engineering Organization
  
System Design Group: by the owner and the Universal optical fiber composition, design and audit construction blueprint, Sihai optical fiber focus on the construction process design.
  
Project Management Group: by the owner and the Universal Optical fiber composition, Sihai optical fiber is responsible for engineering changes, engineering negotiations, construction management and coordination of the relationship between the two sides.
  
  
2. Construction Service
  
A) wiring supervision
  
The laying of various cables is the most important step in the integrated wiring, so in order to ensure the cabling process is not damaged and the entire system performance reliability and stability, Sihai fiber cabling engineers will be in the construction site and construction staff to complete the laying of the cable in the building. The laying process will also be done in strict accordance with Lucent, AMP standards, from the horizontal cable, backbone cable to the installation of each information outlet. The connection to the information socket, is based on several standards to achieve, that is, 4 pairs of twisted pair can be eia/tia568a, eia/tia568b and other standards to achieve connectivity. It is recommended to use 568B connection mode. EIA/TIA568B is the way Lucent and AMP are used to. (Computer science)
  
b) Wiring
  
In order to ensure the overall wiring system indicators can reach the design targets, my company engineers will be responsible for the master and the subsystems of the wiring and the subsystem cable wiring and jumper installation, and provide users with wiring table.
  
c) Supply
  
According to user needs can be in the user construction site delivery, all products are under the contract of the original packaging.
  
d) Construction
  
The construction personnel after the training qualified rear can mount the post. The main construction personnel are the construction personnel who undertake the large-scale project.
  
The modules and wiring racks are finished by company technicians.
  
e) Management Services
  
Response Speed: 24 hours onsite service.
  
Documents: In order to facilitate the user's management, we will provide users with a complete set of wiring management plan (including the node plan. Schematic diagram of the line plane. Wiring rack operation diagram and other related information).
  
Training: Responsible for on-site training of 2-3 technicians so that they have the ability to independently manage the wiring system.
  
  
3. Construction Technology Standard
  
• The horizontal branch of the backbone of the United States Lucent. AMP Company produces 8-core, five-type twisted pair of UTP cable laying.
  
• Information module, wiring racks and other connecting equipment, equipment color standard should be strictly eia-tia-568b standard installation.
  
· Laying point node maximum transmission distance should be less than 100m (excluding conversion equipment), transmission rate should be 155Mbps, can support the system workstation composed of point-to-point and multi-point structure, the system conforms to the eia-tia-568 standard.
  
  
4, Construction technology requirements
  
• In the room standard 19 "cabinets, cabinets in an assembly line rack, information sources by the host or server."
  
• Enter the room of twisted-pair, should be used 1.5cm PVC slot board, according to five types of line eia/tia568 standard installation.
  
The information outlet is installed 0.3 meters from the ground.
  
• End-connection information socket, twisted-pair wire stripping the head to expose the outer skin distance to be short, and need to follow its twist and direction for more than one week to ensure that the end of the twisted-pair stranded wire and the degree.
  
• Reservation information socket base, at the entrance of the pipe to cover the rubber protective sleeve or grinding to the interface gap, to ensure that the introduction of the horizontal line is not cut by the entrance gap.
  
• Double stranded wire installation should be a group of three, the line too long must relay installation, laying should pay attention to reduce the line of tension to prevent stranded line damage.
  
• All lines are laid down and must be marked with a strong sticker at both ends.
  
  
5. Specific requirements for construction
  
1) require the construction personnel to comply with the owner of the management system.
  
2 requires strict adherence to Lucent. AMP technical indicators and national standards, so that the project to meet the design requirements.
  
3) to be completed on schedule.
  
  
6. Preparatory work for the prophase of construction
  
1 According to the Ministry of Construction on the integrated wiring system engineering quality requirements, reasonable organization and implementation of total quality management.
  
2 carefully organize the technical staff to learn design drawings, understand the design intent, and make good drawings to the disclosure of triage work.
  
3 further study the construction code, acceptance code and technical standard.
  
4 on the basis of the request book, according to the views of the Finance Bureau to revise the construction design drawing and construction plan.
  
5 The quality of the project is prone to problems, take preventive measures.
  
6 Strengthen the procurement and inspection management of engineering related materials, establish a quality assurance system and determine the quality responsible person system.
  
7) To strengthen communication and communication with the technical staff of the owners, to achieve the management, supervision, construction is not disjointed, quality and quantity to complete the project.
  
  
7, the construction process of quality assurance
  
1 Set up the quality Supervision group, and be responsible for the quality inspection in the process of project implementation.
  
2 The construction personnel to do a good job of technical disclosure, in strict accordance with the design drawings, standardize the process operating procedures, the organization of various sections, the construction of the partial project.
  
3) To strengthen the construction of the construction process management work, construction quality to be inspected by the supervision, design department.
  
4 to each professional construction cross more complex parts of the site should be organized in advance triage, at the same time do a good job of coordination, to avoid the installation after the removal of rework phenomenon.
  
5 The installation of finished products, semi-finished products protection, to take appropriate protection measures, and the on-site products for patrol.
  
6 The installation of materials and equipment inspection work to eliminate the inflow of unqualified products.
  
7 The completed sub-item, Division works, timely quality self-test and report to party A for evaluation and acceptance, qualified to cover, without leaving hidden trouble.
  
8 strengthen coordination and cooperation with other professional construction units to ensure the construction quality of each system.
  
  
8, wiring construction security measures
  
In the construction process must strictly implement the national construction rules and regulations, earnestly carry out the policy of "safety construction, construction must be safe" and "Prevent prevention", strengthen the scientific management of safe construction, set up safe construction responsibility system, strengthen safety training for construction personnel, guarantee the safety of completed works, and eliminate the occurrence of safety accidents.
  
1 According to the safety construction system of the project, organize the construction personnel to study, strictly abide by, set up safety inspectors responsible for construction safety work.
  
2 Site construction personnel, under any circumstances shall not be illegal construction, should observe the following disciplines:
  
A It is forbidden to post after the shower.
  
b Site Construction personnel should be consciously subject to safety inspectors and party a guardianship inspection.
  
C Site Construction personnel should consciously abide by the construction site and party a safety management department of the relevant provisions.
  
3 The construction of the relevant holes must be dealt with to prevent the occurrence of related accidents.
  
4 The construction site used by the relevant construction equipment should pay attention to safe placement, to prevent the use and improper placement caused by accidents.
  
5 to the relevant site production and interference of the larger processing operations should be as far as possible away from the area.
  
6) Strengthen the on-site construction power management, the relevant equipment and wiring should be done regularly check and maintain.
  
7) To strengthen the concept of the discipline of construction personnel, not to the office area and production area disorderly channeling and loud noise.

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.