1. Title:
1. Prepare the Kanban board.
2. The task is claimed and the claimant is marked on the task label on the Kanban board.
- First by the individual initiative to lead the task, PM according to the specific situation of the task balance.
- Then everyone embarked on the task of achieving their own.
3. For team work Happy progress, please adhere to the daily meeting.
- Set the time and place for the daily meeting.
- Photo photos (At least once, posted to the blog).
- At the meeting, we reported in turn: What I did yesterday, what I am going to do today, what problems I have encountered.
- The Kanban is updated at the daily stand.
- The schedule is displayed on the Kanban board after the daily meeting. (Photos can be fixed in a position to shoot, you can also make a daily picture made of animation.) Reference Figure 5)
4. Blog Publishing requirements: Kanban design. Task claim status. The time and place of the next daily meeting, and a photo of a regular meeting including all team members. Kanban progress for daily meetings. Each student records the implementation of their own tasks, can be posted on their own blog.
3. Division:
Product Owner: Chen (32 points) PM Project manager: Zhang Yufa (24 min)
Scrum Master: Chen Ze Exhibition (16 points)
Users: Peng Yijian (8 points)
4. Summary:
because our group decided to do compound interest, but there were some problems, we decided to use Java to do Sudoku games.
scrum4.0+5.0 Sudoku Game