I. Supervision of information network system design phase
1. What are the main contents of the supervision work in the design stage?
2, what is a core switch, a converged layer switch, an access layer switch?
3, understand the function of the firewall, vulnerability scanning system function, the function of the gateway (do not write, read more than three, so familiar with)
4, the intrusion detection system function? (remember)
5, computer equipment room should be zoned layout, generally including which areas? (remember)
6, the host room channel and the distance between the equipment should meet what rules? (Key figures)
7, Room lighting general use what light? What are the requirements of illuminance respectively?
8, what power supply should be used in the computer room system?
9, which four kinds of grounding method should be used in the engine room?
10, power on the main room temperature, humidity should be carried out a class, a level what indicators?
11. What are the requirements for fire alarm and fire extinguishing system in engine room?
12. What are the six parts of the integrated Cabling System (note)? What is the composition of each of the six parts?
13, what are the design points of the workspace subsystem? (remember number)
14, RJ45 connector Demand calculation formula is what? What is the demand calculation formula for the information module? (remember)
15, what is the calculation formula of the cable? (total length, number of cases)
16, in the design of the horizontal subsystem, the way the pipeline includes: direct buried pipe type, what and what?
17. When the optical cable needs turning, the radius of curvature is required? What about the coaxial coarse cable? Coaxial thin cable?
18, inter-device subsystem, how much space between devices? Door height Wide? How much is the floor bearing pressure? (remember number)
19, the building system subsystem, overhead wiring of the line distance not more than how many meters? Antenna bracket should not be higher than the roof how many millimeters? How many millimeters should the net space of the sky-line entrance bar be above the roof?
20, what are the indicators of twisted pair? (remember)
21, what are the indicators of optical cable? (remember)
22, The buried pipeline routing should be based on a straight line, not select curved route, such as must bend, the radius of curvature should not be less than the diameter of the pipe several times? If the outer diameter of the tube is greater than 50MM, the radius of curvature should not be less than the diameter of the pipe several times? How many degrees should the angle of a turn not be less than? What should I do if I have 2 bends? What if the length of the curved pipe is longer than 20M?

Ii. supervision of the implementation stage of the construction of Information network system
1. What are the contents of supervision before commencement? Remember
2, network engineering supervision of the main work?
3, integrated testing supervision of the main work?
4, equipment procurement supervision of the focus?
5. What is the process of equipment purchasing supervision?
6. What are the four key points in the construction supervision of the computer room project?
7, from the technical control of the content, supervision engineers need to put the good San Guan, San Guan is what?
8, the room environment to meet the requirements, such as: floor load capacity (remember), the surface resistance (remember), the cabinet before and after the left at least how much?
9, for the covert project, the metal trunking installation, pipe installation, pipe threading in the supervision of the matters of attention (do not write, Lang read 3 times)
10, LAN cabling System test content mainly include Which? Remember
11. What are the main contents of UTP link test? (in 13 names, remember at least four or more)
12. What are the four types of optical cable testing? What are the tools for testing? Remember
13, the network system debugging and installation is divided into which four steps?
14. What are the contents of the power-on test?
15, the supervision of the host system to install the test when the attention to what matters?
16. What precautions should be taken when installing and testing the software system by the supervisor?

Supervision of information Network system acceptance stage
1. What are the prerequisites for acceptance? Remember
2. What are the eight steps in the general procedure of formal acceptance?
3, the contractor should be in the training program clear (), to ensure the normal maintenance of the system. Remember
4, in the Information network system acceptance stage, the supervision needs to review what content?
5, network equipment and TCP/IP network detection is the main consideration of the technical indicators (note), respectively, four nouns to explain.
6, in the installation of equipment acceptance, cabinet, rack installation requirements?
7. What are the tools for testing and acceptance of network system? (Remember the name of any 2)
8. What is the basis for the acceptance of the information network system, and what is the main verification?

Soft Test Information System Supervisor: April 15, 2016 homework

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.