Typical Pentium software delay loops can be written using MOV and LOOP instructions.
For example, the following instruction sequence can be used for a delay loop: MOV CX,countDELAY: LOOP DELAY
The initial loop counter value of “count” can be calculated using the cycles required to execute the following Pentium instructions:MOV reg/imm (1 cycle)LOOP label (5/6 cycles)
Note that the Pentium LOOP instruction requires two different execution times. LOOP requires six cycles when the Pentium branches if the CX is not equal to zero after autodecrementing CX by 1. However, the Pentium goes to the next instruction and does not branch when CX = 0 after autodecrementing CX by 1, and this requires five cycles.
This means that the DELAY loop will require six cycles for (count - 1) times, and the last iteration will take five cycles.
For a 100-MHz Pentium clock, each cycle is 10 ns. For 2 ms, total cycles =2ms/10ns= 200,000. The loop will require six cycles for (count - 1) times when CX + 0, and five cycles will be required when no branch is taken (CX = 0). Thus, total cycles including the MOV = 1 + 6 x (count - 1) + 5 = 200,000. Hence, count = 33,333,0. Therefore, CX must be loaded with 33,33310

聯繫我們

該頁面正文內容均來源於網絡整理,並不代表阿里雲官方的觀點,該頁面所提到的產品和服務也與阿里云無關,如果該頁面內容對您造成了困擾,歡迎寫郵件給我們,收到郵件我們將在5個工作日內處理。

如果您發現本社區中有涉嫌抄襲的內容,歡迎發送郵件至: info-contact@alibabacloud.com 進行舉報並提供相關證據,工作人員會在 5 個工作天內聯絡您,一經查實,本站將立刻刪除涉嫌侵權內容。

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.