QM-Quanlity Planning-Test Your Knowledge

來源:互聯網
上載者:User

Source : PLM  412 Quanlity Planning

今天做了還可以,只錯了一道。有幾道有疑問的,基本都猜對了。
1. The plan usage is stored in the inspection plan header.
Determine whether this statement is true or false.
□ True
□ False
2. Materials, vendors, and customers can be assigned using the inspection
plan header.
Determine whether this statement is true or false.
□ True
□ False
3. A work center can be assigned to the operation in the task list.
Determine whether this statement is true or false.
□ True
□ False
4. Test equipment can be assigned directly to an inspection characteristic in an
inspection plan.
Determine whether this statement is true or false.
□ True
□ False
5. Documents can also be assigned as test equipment / production
resources/tools.
Determine whether this statement is true or false.
□ True
□ False
6. The test equipment used can be inspected regularly.
Determine whether this statement is true or false.
□ True
□ False
2006/Q2 2006 SAP AG. All rights reserved. 261
Test Your Knowledge PLM412
7. Dependent characteristic specifications can also be entered for referenced
master inspection characteristics.
Determine whether this statement is true or false.
□ True
□ False
8. Dependent characteristics can be used in an operation.
Determine whether this statement is true or false.
□ True
□ False
9. The control indicator for inspection characteristics can always be changed
in the task list.
Determine whether this statement is true or false.
□ True
□ False
10. Several materials can be inspected with one inspection plan.
Determine whether this statement is true or false.
□ True
□ False
11. You can use a reference operation set as a copy model for creating new
inspection plans.
Determine whether this statement is true or false.
□ True
□ False
12. The operations from the inspection plan and the reference operation set are
displayed in the product structure.
Determine whether this statement is true or false.
□ True
□ False
13. The Engineering Workbench cannot be used to process reference operation
sets.
Determine whether this statement is true or false.
□ True
□ False
262 2006 SAP AG. All rights reserved. 2006/Q2
PLM412 Test Your Knowledge
14. Mass change is possible in the Engineering Workbench at both operation
level and characteristic level.
Determine whether this statement is true or false.
□ True
□ False
15. The work area is used to define which areas are offered as selection criteria
on entering the Workbench.
Determine whether this statement is true or false.
□ True
□ False
16. Inspection characteristics are connected to engineering change management
as objects.
Determine whether this statement is true or false.
□ True
□ False
17. By using engineering change management, different validity statuses can
exist for an inspection plan.
Determine whether this statement is true or false.
□ True
□ False
18. The change master record can be structured in such a way that changes can
only be made to inspection plans, but not to materials, with one change
number.
Determine whether this statement is true or false.
□ True
□ False
19. It is not possible to carry out an inspection according to specifications from
an inspection plan and a material specification.
Determine whether this statement is true or false.
□ True
□ False
2006/Q2 2006 SAP AG. All rights reserved. 263
Test Your Knowledge PLM412
20. The material specification can supplement the specifications from the
inspection plan.
Determine whether this statement is true or false.
□ True
□ False
21. The specifications from the material specification are attached to the last
operation in the inspection lot.
Determine whether this statement is true or false.
□ True
□ False
22. Flexible inspection characteristics can be used at inspection lot creation.
Determine whether this statement is true or false.
□ True
□ False
23. The use of flexible inspection specifications is linked to an authorization.
Determine whether this statement is true or false.
□ True
□ False
24. The flexible inspection specifications function is not always available in
the standard system.
Determine whether this statement is true or false.
□ True
□ False
25. You can include multiple specifications in all task lists.
Determine whether this statement is true or false.
□ True
□ False
26. The multiple specifications can be used in the complete inspection process.
Determine whether this statement is true or false.
□ True
□ False
264 2006 SAP AG. All rights reserved. 2006/Q

聯繫我們

該頁面正文內容均來源於網絡整理,並不代表阿里雲官方的觀點,該頁面所提到的產品和服務也與阿里云無關,如果該頁面內容對您造成了困擾,歡迎寫郵件給我們,收到郵件我們將在5個工作日內處理。

如果您發現本社區中有涉嫌抄襲的內容,歡迎發送郵件至: info-contact@alibabacloud.com 進行舉報並提供相關證據,工作人員會在 5 個工作天內聯絡您,一經查實,本站將立刻刪除涉嫌侵權內容。

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.