Construction essentials and experience of integrated wiring system

Source: Internet
Author: User
Tags requires

Ballroom integrated Wiring Market rapid development, many enterprises, communities and families are beginning to introduce a comprehensive wiring system, however, after all, this market is still a development of the market, so the specific construction quality wiring has a lot of problems, I believe in this, many business people and home users are deeply touched, For example, more and more family enterprises in order to achieve a variety of business requirements, as far as possible to reduce the expenses of enterprises, everything must be hands-on, the network cabling system in each room should pay attention to what is worth pondering in the implementation process.

You should know before the commencement

Generally speaking, the network cabling system can be divided into telephone line wiring, integrated wiring and Ethernet cabling three categories, which are suitable for different environmental conditions, users should have a basic understanding of them before the commencement of construction. Bug Network Technology

Traditional telephone line wiring system is also known as "household Line project", because the system is mainly used for transmission of voice signals and narrowband data signals, generally using a pair of copper wire to achieve long-distance transmission, distance can reach 3~5 kilometers. This wiring can be from the area of the computer room laying large logarithm copper cable to the community, a community based on the size of a few points, from the point of contact to the building Unit set wiring box, if there is a user to install the phone, from the wiring box directly into the door, the wiring project has a simple construction, the construction process requirements are not high, can be long-distance transmission characteristics. More Wonderful content: http://www.bianceng.cn/Network/zhbx/

Intelligent building wiring is also known as integrated wiring, it is a system integration center through the integrated wiring system will be office automation system, communication automation system and power, fire, security, lighting, air-conditioning and other security monitoring automation system, to achieve the purpose of information management. This wiring project is generally implemented in one or several office buildings, with information points diversity, unit area information points dense (2 information points/10 square meters), transmission bandwidth requirements of high characteristics.

Community Ethernet cabling using star structure, through the "Fiber + five Lines" approach, generally in several or dozens of residential buildings, to provide users with high-speed broadband interface. Community Ethernet Cabling has five types of line transmission distance short (only 100 meters), construction technology requires high characteristics, compared with the integrated wiring, community Ethernet cabling Information point single, less per unit area information points, line environment is poor, but the Ethernet access technology is very mature, standardized, average port cost low, high bandwidth, Low cost of client equipment, is the current wiring hotspot.

Wiring preparation and step experience

Usually network engineering after investigation, to determine the scheme, the next step is the implementation of the project, and the first step is the implementation of the project before the preparatory work: the design of integrated wiring of the actual construction map, to determine the location of wiring, need to consider such as: concealment, damage to the building (structural characteristics) In the use of existing space at the same time to avoid power lines and other lines, the scene of the cable and other necessary and effective protection needs, construction workload and feasibility (such as hitting the wall, etc.), and so on, and then the drawings provided to the construction personnel, supervisors and supervisors to use;

Then the planning and design and budget, according to the above situation to determine the route and apply for approval, such as the need to hit the load-bearing beam on the wall when the need to apply to the management department, otherwise violate the construction laws and regulations, the whole planning and the degree of destruction is best approved by party A and management; On the basis of the formal planning of the final licensing procedures, the calculation of materials and employment, the cost of the design implementation of the management operation and so on to propose budget and duration and construction plans and arrangements. The degree of coordination of the user side needs to be considered in the implementation plan. The implementation of the program needs to negotiate with the user to endorse the signature, and designated coordination responsible personnel designated project leader and engineering supervision personnel, responsible for planning preparation, maintenance, user side of the requirements and other aspects, put forward the timetable for each department, responsible for internal and external coordination and construction organization and management on-site construction site certification test Make the test report make wiring marking system?

Need to remind of the network engineering construction process requires a lot of construction materials, some of these materials must be prepared before the start of the material, and some can be in the process of preparation, the main cable, twisted-pair, sockets, information modules, servers, power supply, hubs, such as the implementation of the purchase of goods manufacturers, and determine the date of delivery, Different specifications of the plastic Groove Board, PVC fire hose, snake skin pipe, tapping screws and other wiring materials in place, if the hub is centralized power supply, then ready to wire, iron pipe and the establishment of good electrical equipment safety measures (power lines must be in accordance with the standard standards of civil architecture), the establishment of construction schedule (to leave the appropriate room, Unexpected things may happen at any time in the construction process and require immediate coordination.

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.