Decoration should pay attention to damp-proof-- Shenzhen Xiong Yu design
Summer due to the hot weather, renovation works smoothly, construction is convenient, but not easy, due to wood floor deformation caused by wall cracks, damp, warping, dry paint fog consequences. So some special attention to summer construction.
Avoid moisture in the material
Summer high temperature, easy to absorb moisture materials such as wood, plate, gypsum board, in the transport or storage of any improper treatment prone to damp, damp after the plate will be moldy point. If a slab plaster ceiling, keel, because the shrinkage coefficient than gypsum board, wood keel stereotypes will directly lead to gypsum ceiling surface, affect the decoration quality is very good. In order to avoid moisture, materials should be placed in the indoor ventilation and dry place, can be put into use, easy to buy back moisture materials. Piles in the warehouse material placed in a dry ventilated repo tide, at home, can maximize the quality of the material.
The wooden floor was left with
In the laying of wood flooring, to grasp the expansion coefficient, so that the solid wood flooring, the floor gap is too large or too small will affect the investigation results, the floor gap is too close, wood floor arch deformation phenomenon occurs.
Keep the wall dry
Wall decoration, especially important dry processing base putty. Especially in the processing paste tiles, walls, can not be too dry finishes, general treatment before pouring water, so that its absorption of moisture in the air will produce a layer of fog. The best way is to use a desiccant to make the painting do some. Summer decoration also encountered latex paint because slowly stale moldy, in the hot weather. In the drying process of the project the basic Putty is done well, the wall should be in you can brush paint to hit three to four times putty. Each time the putty up, drying time to try to prolong, good ventilation, to minimize indoor humidity. If the putty is not dry under the conditions of repeated dozen putty or brush paint, and excessive moisture lock, the wall will "sweat", and even large area cracking phenomenon.
Pay attention to the choice of construction team
In the summer, the sensitive season decoration, please formal decoration company is particularly important, in addition to look at the decoration Company's qualification certificate, business license, to the individual as "the company's sub-contract under the project of the" guerrilla "method, but also to inspect the office of decoration personnel, ask them to do. This model project.
Make seasonal repairs
After completion of the family improvement project, there will be a six month to one year warranty period during the engineering break repair season. For the door and wall of the junction, plaster line on the wall, two different materials of the expansion coefficient is not the same, the change in the season, easy to crack, the change of air humidity, cracking is a normal crack, from the humid summer dry, winter transfer, this phenomenon is very common, belongs to the decoration Company's warranty coverage. So the customer is looking for a good one.
Decoration should pay attention to moisture-decoration tips