Task timeout processing is a common requirement, such as when doing more time-consuming operations (such as network requests) or when taking up some of the more valuable resources (such as database connections), we usually need to set a time-out for these operations and terminate the operation and reclaim resources when the execution time exceeds the set threshold. There are two ways to handle time-out tasks in Java: One is based on time-outs of asynchronous task results, and one is to use a deferred task to terminate a timeout operation. Details are provided below.
A. Timeout acquisition based on asynchronous task results
The results of asynchronous task-based fetching is usually used with the thread pool, and when we submit a task to the thread pool, we return a future object, and when we call the Get method of the future, we can set a time-out and throw an exception if the task is not finished before the set time. Next look at the code:
Public classFuturedemo {StaticExecutorservice executorservice= Executors.newfixedthreadpool (Runtime.getruntime (). AvailableProcessors ()); Public Static voidMain (string[] args) { future<String> future = Executorservice.submit (NewCallable<string>() {@Override PublicString Call () {Try{TimeUnit.SECONDS.sleep (10); } Catch(interruptedexception e) {System.out.println ("The task was interrupted. "); } return"OK"; } }); Try{String result= Future.get (2, Timeunit.seconds); } Catch(Interruptedexception | executionexception |timeoutexception e) {Future.cancel (true); System.out.println ("Task timed out. "); }finally{System.out.println ("Cleans up resources. "); } }}
Run the code with the output as follows:
Second, use the delay task to terminate the timeout operation
Another way to implement a task timeout is to set a timer before the task is submitted, which cancels the task after the set interval. Of course, if the task is completed within the specified time, remember to cancel the timer. First look at our worker threads:
Public classRunningtask {Private volatile BooleanIsstop; Public voidStop () { This. isstop=true; } Public voiddoing () {intI=1; while(!isstop) { Try{TimeUnit.SECONDS.sleep (1); } Catch(Interruptedexception e) {}} System.out.println ("The task was interrupted. "); }}
This worker thread checks the Isstop variable every second, so we can cancel the task by isstop the variable. As for the logic of canceling the task we put in the timer, the code is as follows:
Public class Implements Runnable { private runningtask runningtask; Public Canceltask (Runningtask runningtask) { this. Runningtask= runningtask; } @Override publicvoid run () { runningtask.stop (); }}
As you can see, the function of this timer is to interrupt the operation of the worker thread after a certain amount of time. Next Test:
Public classScheduledemo {StaticScheduledexecutorservice executorservice= Executors.newscheduledthreadpool (Runtime.getruntime (). Availableprocessors () * *); Public Static voidMain (string[] args) {runningtask runningtask=NewRunningtask (); Scheduledfuture<?> scheduledfuture = Executorservice.schedule (NewCanceltask (Runningtask), 3, Timeunit.seconds); Runningtask.doing (); if(!Scheduledfuture.isdone ()) {Scheduledfuture.cancel (true); } }}
The results of the operation are as follows:
As you can see, the task can also be canceled after a timeout.
How Java implements Task timeout processing