Visual Studio Engineering name modifications can be made by referring to the following methods, such as renaming XYZ project to ABC:
1. Rename the project SLn file as ABC.sln, rename the folder xyz to ABC.
2. Open the. sln file with a text editor,
This article fixed link: http://yanxin8.com/3766.html article from yanxin8.com
Software often need to update, if through online notification users will be more convenient, so the end of April for Notecard software added automatic detection update
Basic commands for Linux learning from deploying test environments, the main Linux commands used to deploy the test environment are:
1. Copy files from afar to local directory:
SCP [parameters] [Original path] [Target path]
SCP remote User name @IP
It is sometimes important to view the installation path (address) of a software in Linux. For example, the quick start of a file is deleted, or you want to create a quick launch, or want to delete, add installation files, and so on, many places have
The way to update the software in Ubuntu is as follows three steps:
1. Back up the original software source files
To set the source file in /etc/apt/sources.list , first back up the file Cp/etc/apt/sources.list/etc/apt/sources.list.bak
2. Add the
FPort and Connectionwatcher are both viewing port occupancy;FPort applies to Windows XP and is not available for Windows 7;Connectionwatcher can be used for Windows 7;Download
1, the source code installation when the network looked at the configuration script: Configureand configure generally have--prefix parameters, indicating the directory of software installation, use this parameter more. It's easier to delete software.
Why Software Testing:
Product quality assurance control cost of key software reliability confirmation to enable enterprises to have international competitivenesssoftware Test definition:Software testing is the whole of " verification (verification)"
Restart software void mainwindow::on_pushbutton_ui_reboot_clicked ()
{//mode 1 requires the event loop in the main function to Judge//qapp->exit (773);//restart code, 773 = ' R ' + ' E ' + ' s ' + ' t ' + ' a ' + ' r ' + ' t ' ==>restart
Mode 2
Find what vary and encapsulate it. Favor composition over inheritance. The open-closed principle principle is that a software entity should be open to extensions and closed to modifications. Liskov Substitution Principle (Richter substitution
For every friend without a computer, constantly copy, paste, cut, paste .... is often the case, and the computer power outages, program abnormal exit, due to hand and wrong off the editor and other similar nightmares occur frequently. Before I found
1. Testers must undergo training in basic knowledge and theory of testing.
2. Testers must be familiar with system functions and business.
3. The test must be planned beforehand, and the test plan should be coordinated with the whole project plan.
4.
Version of the test report
The person and time of the test
The defects covered by the test-all the defects of the Test team in this round of testing, the defects that the test leader handled and the engineer's verification were reported. Not only to
Packages downloaded through the Apt-get command can be placed in the
/var/cache/apt/archives directory
to download the file location in the
/etc/apt/source.list file
by Apt-get AutoClean command to delete packages stored in this location
First, Reliability
(1) Integrity test
Integrity testing focuses on assessing the robustness of test objects (the ability to prevent failure), the technical compatibility of languages, grammars, and the testing of resource utilization. The test is
1, point folder comparison button;
2, enter the path of the left and right folder;
3. Click "Expand All" in the "Edit" menu, "Select All";
4. Click "Show Differences" in the "View" menu.
5, "Operation" through the menu bar "compare content";
5,
Recently the company wants to examine the demand skills, take a time to sum up experience, improve skills, after work to read two books on demand, one is the company as a demand for personnel textbooks, "Software needs best practice" m, one is
First, preface
The soft work document is over, first to say how I feel. The whole document knocked down is actually a software development process, like to let you keep a small thing, first you need to know that he is suitable for you
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.
A Free Trial That Lets You Build Big!
Start building with 50+ products and up to 12 months usage for Elastic Compute Service