The new book Project: Water Conservancy and hydropower project construction diversion hydraulic calculation and. NET Programming "

Source: Internet
Author: User

Directory

The first basic theory article

Chapter 1 Overview of construction guide Closure design

Chapter 2 Basic Hydraulic calculation

2.1 Critical Depth Calculation

2.2 Normal water depth calculation

2.3 Weir Flow Force calculation

2.4 Calculation of flow force in open channel

2.5 hydraulic calculation of pipe flow

3rd Chapter hydraulic Calculation of construction diversion

Hydraulic calculation for diversion of 3.1 over-water cofferdam

3.2 Notch Diversion Hydraulic calculation

Hydraulic calculation of discharge flow in Longkou 3.3

3.4 Hydraulic calculation of open channel diversion

Hydraulic calculation of 3.5-beam narrow riverbed by staged diversion

Hydraulic calculation of discharge flow in 3.6 diversion tunnel

3.7 Hydraulic calculation of combined discharge flow

3.8 Hydraulic calculation of flood control calculation

4th Chapter Construction Diversion Plan decision

4.1 Evaluation Index of construction Diversion plan

4.2 Evaluation and decision-making method of construction diversion scheme

5th Chapter River Closure Hydraulic calculation

The second piece of programming development

6th Chapter Requirements Analysis

6.1 Domestic and international status, level and development trend

6.2 Requirements Analysis Method

6.3 Functional Requirements

6.4 Basic requirements for pre-and post-processing

6.5 Workflow and software operation process

7th Chapter Software Architecture Design

7.1 Schema Mode selection

7.2 Overall system Design

7.3 Function Module Design

The 8th Chapter key technology and programming method

8.1 Key Technologies

8.2 Software Development Process Model

8.3 Selection of programming methods

9th chapter. Introduction to NET object-oriented programming

The 10th chapter is the basic hydraulic calculation. NET programming

10.1 Critical Depth Calculation programming

10.2 Normal water depth calculation programming

10.3 Weir flow Force calculation programming

10.4 calculation and programming of Flow force in open channel

10.5 Pipe Flow Hydraulic calculation programming

The 11th chapter is the hydraulic calculation of construction diversion. NET programming

Hydraulic calculation for diversion of 11.1 over-water cofferdam

11.2 Notch Diversion Hydraulic calculation

Hydraulic calculation of discharge flow in Longkou 11.3

11.4 Hydraulic calculation of open channel diversion

Hydraulic calculation of 11.5-beam narrow riverbed by staged diversion

Hydraulic calculation of discharge flow in 11.6 diversion tunnel

11.7 hydraulic calculation of combined discharge flow

11.8 hydraulic calculation of flood control calculation

Chapter IV Construction Diversion plan decision-making. NET programming

The 13th chapter is the river closure hydraulic calculation. NET programming

14th Chapter Interface and interactive design

14.1 Graphical user interface Framework DockPanel Suite

14.2 Guide Closure scheme design Interactive interface

14.3 Interactive editing

Use of 14.3.1 PropertyGrid

Dynamic property display for 14.3.2 PropertyGrid

14.3.3 PropertyGrid Custom button

The 15th Chapter Object Access Technology

15.1 deep, shallow serialization

15.2 Comparison of serialization methods

15.3 Implementation of diversion building object access

15.4 implementation of hierarchical relationship access for diversion scheme

The 16th Chapter Graphic display Technology

16.1 selection of third-party graphics controls

16.2 zedgraph Basic Usage Tips

16.3 zedgraph Static graphic display

16.4 zedgraph Dynamic Graphic display

The 17th Chapter file output Technology

Requirements for calculation Book of design results of 17.1 guide closure

17.2 Computational Book Template technology

The 18th chapter The realization of the project case database

18.1 Engineering Case Form

18.2 Engineering Case Database Design

The third project case

19th Chapter discharge capacity Calculation of diversion tunnel

The 20th chapter of Xiluodu Hydropower Station Project 6 Diversion tunnel combined discharge flow calculation

21st chapter Calculation of Diversion scheme of Shimen-Kan hydropower project

The 22nd chapter of the XXX Hydropower project closure calculation

The new book Project: Water Conservancy and hydropower project construction diversion hydraulic calculation and. NET Programming "

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.