2015 the city's subway mileage breakthrough 700 km (reporter Chen Sh) This city urban subway line network will be encrypted, between the third Ring road and the four ring road will get through the subway "broken" line, and will extend the existing lines, so that the total number of subway operations in 2015 increased by 200 kilometers, the final breakthrough 700 kilometers. In order to alleviate the traffic congestion pressure in the central area, the city will encrypt the urban rail transit network and improve the coverage of rail transit. Next year Line 9 line south, line Line 8, two North section will be opened early operation. At present, the urban area encryption line has completed planning and design, waiting for approval. If approved, the city's rail traffic mileage, will be built in 2015 to build 19 lines, to reach 561 kilometers on the basis of a new number of urban encryption lines, an increase of more than 200 kilometers operating mileage, the final breakthrough 700 km operating mileage. According to the introduction, now completed planning and design of the urban area of encryption lines, mainly distributed between the third Ring road and four loops. These urban new line design process, pay attention to get through the "decapitation" line.
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.