Black list of rising dust will be cleared out of Nanjing market
Source: Internet
Author: User
Keywordswill be dust
This year, Nanjing has 60 pollution days in 5 years, the most rain sewage diversion is for backfill soil to find alternatives to reduce dust Wang Juan Autumn training Wang Hongbin Chen Yunan capital city as long as the rain, not windy, air quality is not how, this is the heart of the public. Reporter inventory data found that as of yesterday, Nanjing accumulated 60 pollution days, which is the worst result in nearly 5 years. Yang is mostly "local dust", but it does not rain reporter query Nanjing nearly 5 years of air quality report found that 06 year of pollution days for 59 days, 07 53 days, 08 43 days, 09 51 days. Although this year is not over, but up to yesterday there have been 60 pollution days, Nanjing Air this year is the dirtiest 5 years, has no suspense. In January-July this year, there have been 39 pollution days, 51 of which lasted 8 pollution days. Meanwhile, in addition to two days with the northern dust weather related, the remaining 6 days, according to the analysis, "due to the lack of local dust control in Nanjing caused." "Even into the October, because of the continuous rain in Nanjing, fog and haze, the city more dust accumulation." Coupled with the construction of road projects, resulting in increased dust, air quality dropped sharply. In the November, under the double effect of fog and straw, the air in Nanjing reached the "heavy pollution". December If the north wind blows or rain, so that the dust was containment may be completed, but God is not. Environmental experts, a large area of site construction, coupled with the dust protection measures are not in place, directly leading to the atmosphere of respirable particulate matter indicators in difficult conditions. In addition to the site dust, car surges are also the main cause of motor vehicle exhaust pollution also can not be overlooked, 2004 years to 2009 in just 5 years, the annual increase in motor vehicles to 72,200 vehicles, including the average annual increase of 55,800 vehicles. Into the 2010, this growth rate has become nearly 20,000 vehicles a month, the reporter from the Environmental Protection Bureau and the Department of the linkage database found that, at most, Nanjing monthly new car licensing more than 30,000, the public private car accounted for the "big head." By the end of November this year, Nanjing had a capacity of 1.22 million vehicles, including 630,000 private cars. In motor vehicle exhaust emissions, a large number of pollutants are fine particles, is one of the main causes of haze. In the past few years, Nanjing environmental protection departments, such as the joint housing construction construction and other seven departments also introduced a number of measures to govern the air, why this year's pollution is more serious than in previous years? "Control strength not catch up with the pollution rate" Nanjing environmental monitoring experts said that this year, Nanjing construction site reached more than 1700, which is a very large source of pollution. Early management is ineffective, dust-lowering measures are not in place, lead to increase the total amount of dust, although in mid-November, Nanjing dust on the "crackdown", at that time achieved obvious results, but from last week's blitz supervision, the relevant functional departments of the lack of supervision, dust regain serious, directly affect the entire region's air quality. Wang Juan in the Nanjing environmental comprehensive Regulation meeting held by the Construction Commission yesterday, the city's chief Zhou JinlangmingSure, next year the department will be in the renovation, to minimize the "disturbing" index, and at the same time set up a red-black list, and will employ the surrounding masses to do the supervisor, the violation of the construction process, resulting in dust, noise, etc. and "incorrigible" black list units will be strictly investigated, until the Nanjing market clear. Guangzhou Road, such as the completion of the Spring Festival before the public most concerned about the road renovation, will one of the Han Fu Street to the Yangtze River Road comprehensive regulation adjustment for next year after the implementation of the Spring Festival, the adjustment started with Hanzhong Road intersection of the Archway Lane, and North Gate Street connected to the Rich Mountain Tunnel, Jianye District Street (Sai Hongqiao-Jiangdong middle section) comprehensive renovation, This will ensure the completion of the Chahar Road, Hu Bu Street, Royal Road Street, Overseas Chinese Road, and other 35 main roads of the year. Nanjing Living Construction Construction Commission assistant He Jinshe said that this year, the 35 main roads will be complete final acceptance, but Guangzhou Road, Zhujiang Road, there are several rain sewage shunt work well, because of the complex underground geological situation, to be completed before the Spring Festival. For this year's urban environment comprehensive renovation work, Nanjing Live Construction Commission director Zhou Jinliang Frankly, many people reflect that in the construction process, the dust pollution is too big, for this, the housing construction project has done a research, found that the current use of this backfill is a kind of material called two ash, because of its own relatively light quality, it is indeed easy to dust, And now they have managed to find a replacement for this backfill, this is not easy to dust the replacement of the material has been tested in the Yunnan Road area, if the test results are ideal, next year construction will be promoted. He also disclosed that in next year's work will also employ the construction area periphery the enterprise, the community, the citizen and so on social duty supervisor, the joint Supervision Project Quality, discovers the illegal construction, may direct to the living constructs the building project hotline to carry on the report. Promise two next year environmental remediation will be more orderly week director bluntly, this year is the environmental comprehensive regulation of the "Adjustment of the Year", next year is "orderly advance year", the following is "promotion sprint year." Next year, the environmental comprehensive renovation work will take the rain pollution diversion as the leading, the unification arranges the construction time series, redeployed the city, the district two level lean strength, guarantees makes one piece, lets the public front light. Nanjing Live Construction Commission director Zhou Jinliang Commitment, Nanjing Environmental improvement standards will be further improved, especially to do a good job landscape and green, "the North Moat, Jinchuan River basin will be very beautiful, we are very confident." He said that the 2011 rain and sewage diversion, integrated pipelines and trunk roads will be co-ordinated to reduce the impact of repeated construction on road traffic; for a single trunk road, avoid the construction of too concentrated, full bloom, resulting in congestion and dust. Data this year 607 streets have been completed by the new Nanjing housing construction construction to provide data showing that This year, the city's rain and sewage diversion accumulated investment of about 2.04 billion yuan; the renovation of the new Street 607, can exceed the beginning of the 600 commitments, 1225 housing renovation completed, the community out of the new completed 52, the other 18 quarters of the new expected to be completed before the Spring Festival; Urban Landscape Road renovation The Chinese Communist Party dismantled outdoor advertising 238,000 square meters, demolition violated the construction of 127,000 square meters, many primary and secondary roads, streets and lanes for new shop recruit, shop licensing. Nanjing, assistant director of the He Jinshe, said after the initial comb, 2011 Nanjing will plan to lay more than 50 trunk roads 40 kilometers of sewage pipe, laying more than 320 streets about 100 km of sewage pipe, the implementation of 340 pieces of rain and sewage diversion, focusing on the renovation of the Jinchuan River, the outside Jinchuan River, the north Moat, Tanggu Ravine, Purple Mountain Ditch, such as 6 about 30 km long river. Combined with the main road rain sewage diversion project to comprehensively control 25 main roads, the renovation of the new Street 600, the simultaneous implementation of the building façade of a new, city appearance rectification, combined with the area of rain and sewage diversion renovation House 800, out of the new Old community 70. Autumn training Wang Hongbin Chen Yu
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.