Smart Grid will break the bottleneck of wind power development
Source: Internet
Author: User
Recently, the State Grid company for the first time to the community announced the "Smart grid" development plan, according to the plan, smart Grid development in China will be divided into three stages to advance gradually, by 2020, can be fully built a unified "strong smart grid." As the smart grid facilitates grid generation of new energy sources such as wind power, wind power is expected to be broken by the bottleneck of power grid dispatch, so the plan is a big "boon" for new energy development such as wind energy. People often "less cars" to describe the plight of China's wind power development. In recent years China's wind power generation by leaps and bounds, the current capacity of wind power has ranked first in the world. But at the same time, China's power grid design and construction is relatively backward, resulting in the wind power generation projects have been launched, but in the electricity network blocked. Industry insiders said, now most wind power plants and grid companies signed must fully accept the power grid regulation of the contract, otherwise the grid companies do not agree to wind power network, thus, wind power plants can not play full capacity. Why is the power grid enterprise's enthusiasm for building wind power grid not high? Days congenial researcher Analysis said, mainly because of poor economic efficiency, complex operation and management, and the State power grid enterprises to carry out wind farm supporting power grid construction policy support efforts are not enough. Wind power is the focus of China's new energy revitalization planning, Pengfei, chairman of the Energy Professional Committee of the Renewable Energies Society of China, said that the original renewable energy medium and long term development plan is 30 Million-kilowatt of the total installed capacity of wind power by 2020, This is now likely to be adjusted to 100 million to 150 million kw, while a 30 Million-kilowatt target could be achieved by 2011. Wind power to obtain rapid development, the construction of smart grid has become a prerequisite, smart grid will become new energy resources to send and deploy a platform to break the wind power development faced by the bottleneck of the grid. Compared with the traditional grid, the smart grid has a more powerful compatibility, creating a greater possibility for the development of renewable energy generation. And once the smart grid is built, countries will encourage households and businesses to install small, efficient renewable power generation equipment and support consumers to buy or sell green electricity. In other words, the smart grid for wind, solar, geothermal energy and other timely access to the grid, the intervention process can also be controlled. Although the smart grid is expected to be built, it still needs a long process. According to the National Grid company announced plans, from 2009 to 2010 as the planning pilot phase, 2011 to 2015 for the overall construction phase, 2016 to 2020 as the leading stage of Ascension, that is, after more than 10 years, our country can usher in a technology and equipment fully reached the international advanced level of " Strong smart Grid. "
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.