The housing has been built for six months, no vacancy rate of 100%

Source: Internet
Author: User
Housing district more than promised to fetch time has been 1.5, but so far the water and electricity has built a house, building a community, nature is to let people live. However, in the Suzhou Feng Road extension of the southeast side, there is a demolition resettlement community, the house has been built for half a year, is slow to let relocated stay. When the reporter delves into the interview, the parties concerned disagree.  For exactly when can stay, more than 100 households relocated so far heart bottomless. Vacancy rate of 100% of the community according to Miss Gan told reporters, 2007, due to the needs of widening the road, in order to tie in with the city construction, the original Suzhou Feng Lu East summer home bridge several sporadic buildings, as well as some of the local cottage, a total of 120 households, in April all demolition completed. At that time, the authorities responsible for the demolition project gave the promise that 2 years later, these relocated will be fetched, that is, in April 2009, can be fetched.  However, to the surprise of these relocated, it is now 1.5 years since the promised time, but there is still nothing to say. "Six months ago, the demolition of the community before there is a scrolling caption, written this year August 26, but now, the house has been built for half a year, these relocated have not been able to live on."  According to Miss Gump, those relocated are mostly elderly people, including her old family. "We have a lot of people looking for the Suzhou Industrial Park Lou Feng Petition Office, however, they have been playing Tai Chi, there is no accurate time to pay the room, a will say August, and then said to the end of the year, and some unexpectedly said, anyway has been waiting for 3.5, and so on.  "Miss Gan said, such an attitude makes her very angry, because many of the relocated are old people, rented outside very not accustomed to, and their life in the above, hope the Stars hope the moon look forward to go home early." To find out, according to the information provided by Miss Gan, the reporter came to Feng Road extension section. The extension of the southeast side, the reporter saw, sure enough, there is a new community, empty, there are more than 10 buildings, there are several small high-rise.  As the sky gradually darkened, the whole building dark, and others brightly lit compared to the people, quite empty lonely, cold wind blowing, behind a hint of coolness. At this time, a passing citizen Aunt Lu told reporters, in fact, early in the first half of this year, this side of the house has been almost built, but do not know why has been no one to live in. "At night, the neighborhood is dark." I live in the neighborhood next door, every night walking past this side of the scary, fear will suddenly come out from inside a bad person. The next day, the reporter again came to the house called Summer home garden demolition community. This time the reception, the reporter said want to go in to see, the front of the people did not say anything, let the reporter went in. Asked if anyone had checked in, one of the staff at the reception said, "There are a couple of families who have already begun to decorate." "He also told reporters that these decoration households are developers of relatives, so can advance home decoration, other relocated I am afraid to next January,To get the house.  In the community, the reporter found that there are both high-level and small high-rise, have been completely built, the overall greening is almost the same.  However, there are a lot of building materials scattered on the road, the door on the left-hand side there is an excavator is working, a worker wearing a helmet told reporters that they are still doing finishing work, cleaning up some construction waste. Why is it difficult to stay in the residential area? "We have many elderly people who are already seventy or eighty years old and have a few 3 years to wait," he said. "Miss Gan told the reporter, because relocated not directly and developers sign contracts, therefore can not be deferred to the property, to the developer claim." However, at that time, it was said that if the relocation is not possible for more than 2 years, the rehousing fee will be doubled. "I heard that some of these relocated were already married, and I don't know if it will be too late," he said. According to Ganxiao revealed that the demolition of the community to make a lot of the early staff of the economic problems were arrested, so dragged a year to start, when the phone was left out, so the relocated do not know who to ask. "Perhaps the government project, the developers are not too gung-hard." In this respect, a netizen said, the demolition of the community has already been built, but dragged to now refused to pay the room, which must have "fishy." "Is it a tofu-slag project?"  "There are also netizens speculate, probably because prices rose again, developers a bit unwilling to pay the house." For Miss Gan reflects the situation, Suzhou Industrial Park, Lou Feng Petition office, a staff told reporters, now the demolition of the community is certainly not living people, because so far, the demolition of the community has not been through water and electricity. "How can people live without electricity and water?" "The reason for the delay, the staff said, this is because the house has been built, it needs to be maintained for some time." As to when the community can stay, they are not clear. "This, you still want to ask the house developer." Subsequently, the reporter also contacted the community's developers-Suzhou Park reconstruction Company.  One of the company's front desk staff confirmed to reporters that the demolition community has indeed been built for some time, but because of the previous water, electricity, gas and other issues, so has been dragged to the present residents do not allow. "Now, the community's power supply problem has not been fully resolved, so the temporary can not stay, and the specific delivery time is not finalized, but to be sure, at least to wait for some time."  And when the reporter asked why did not pay the house has been decorated, the front desk is a careless eye, said that "anyway, the problem of electricity is not resolved, it is impossible to live in." Subsequently, the front desk and the "ball" kicked back Lou Feng petition office, said the specific date of arrival, they are not clear developers, want to know the details or to find Lou Feng Petition office. However, for the front desk, Lou Feng Petition office and gave a negative, saying that residents of the specific time is really determined by the developers. "Developers do not pay the house, they have no way." "Yao a crane Silma/photo

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.