Vs2015 nuget full analysis, vs2015nuget

Source: Internet
Author: User

Vs2015 nuget full analysis, vs2015nuget

 With the release of the official version of vs2015, the installation experience has been greatly improved, except for debugging lamda.

Here is a panoramic view:

The style is completely different. The pre-release version is displayed,The gear in the upper right corner is the nuget setting..

In addition to different interface styles, the bigger difference is that many new features are added, which are mainly concentrated on the right half.

  First, let's look at the first row:

, The installation will be displayed in the uninstalled operations (during installation, you can alsoSelect version.Upgrade, uninstall, and downgrade.

The options below will display different functional options based on whether they have been installed.

If you have not installed:

  

  Check the preview window. When you click "Install", a preview interface for this package will appear, which is no longer displayed here.

  Dependency behavior: Ignore the dependency, minimum, maximum patch, maximum minor version, and maximum.

    Ignore dependencies:It is best not to select this option. Since there are dependencies, how can it run without installation? This is a bit absolute. I don't know why Microsoft designed such an option, obsessive-compulsive disorder?

    Minimum:This is no different from the previous nuget. The installation of the minimum version that meets the dependencies of the software package (whether it is very difficult, huh, huh ).

    Maximum Patches: Let's talk about the version number of the software, for example, 5.3.2. The major version number, the Subversion number, and the corrected version number. If version 1.2.2 is the specified version, version 1.2.0 (or 1.2) is installed ).

    Max minor version: Same as above. If version 1.2.2 is the specified maximum version, version 1.0.0 (OR 1) will be installed ).

    Highest: The maximum version available for installing dependencies.

  File conflict operation: prompt, overwrite all, ignore all.This will not be explained much.

 If you have installed:

    

These options are also clear.

Now, the new version of nuget management has been roughly introduced.Specifies version installation, upgrade, downgrade, and dependency-based installation.

 

Related Article

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.