The online exam summarizes the following 10 knowledge point memory skills:
1. The total investment of the construction project includes fixed asset investment (also called the project cost) and current asset investment (also called liquidity ).

2. fixed assets investment includes: equipment and appliances purchase fee (equipment purchase fee, equipment and production furniture purchase fee), construction and installation project fee (direct fee, indirect fee, profit, and tax) other project construction fees (Land Usage Fee, project construction fee, and future enterprise production and operation fee), reserve fee (basic reserve fee, price increase reserve fee), loan interest during construction period, fixed assets investment direction Adjustment Tax.

3. Basic reserve fee = (device and appliance purchase fee + construction and installation fee + other project construction fee) * Basic reserve rate

4. fixed assets investment direction Adjustment Tax = (equipment and appliances purchase fee + construction and installation project fee + other project construction fee + reserve fee) * rate. Upgrade the tax calculation basis for the transformation project based on the actual investment amount-pre-paid by the annual planned investment of the unit project of the investment project

5. Static investment includes: equipment and appliances purchase fee, construction and installation project fee, construction and other fees, and basic reserve fee

6. dynamic investment includes reserve fees for price increases, loan interest during construction, and Adjustment Tax for fixed assets investment.

7. Liquidity = Current Assets-current liabilities

8. construction and installation project tax refers to the business tax, Urban and Rural Maintenance and Construction Tax, and Education Fee additional

9. Construction Cost structure of the World Bank: direct project cost (Land Acquisition fee, off-site license fee, site fee, and service construction fee) indirect project costs (project management fee, Test start fee, owner's administrative fee, pre-production fee, freight and insurance fee, and local tax), emergency costs (preparations for projects not clearly defined-certainly occurred, unforeseen reserves-not necessarily occurred) construction costs increase

10. The composition of construction and installation project costs in foreign countries is roughly the same as that in China. The calculation is basically the same as that in China (direct fee-different from the start-up fee, management fee, and profit tax)

Summary of the above knowledge point memory methods online, hope to help you, I wish you a successful test!

The cost engineer examination is conducted in four half-day periods. The examination time for "project cost management" and "Construction Engineering Technology and measurement" is two and a half hours; the test time for "project pricing" is 3 hours; the test time for "Project Cost case analysis" is 4 hours.

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.