When a decoration contract is signed, the project budget provided by the decoration company is an important part of the contract. A detailed review of the budget book is an effective way to prevent low-price traps of some bad companies. The review of the budget book for home decoration should start from the following aspects:
Project Review:
The budget documents provided by the home decoration company must be divided according to the functional area of the house. The construction projects and engineering quantities in the area are listed in detail. In this way, the owner can easily review the construction project according to the room. At the same time, because the computing area is reduced and the Project location is clear, it also makes the engineering review easier.
Process Review:
The budget provided by the home improvement company should contain the construction engineer of the corresponding project
Workflow. This process must be detailed, so that the owners who do not know how to do so should have a basic understanding of the construction method. If a home improvement company only has a few technical descriptions in the Budget Book provided to you, this company must not be a formal and responsible company, it avoids construction risks by using the lack of engineering knowledge of the owner, leaving Great operability for the company's construction personnel, but leaving hidden risks for the owner's engineering quality.
Unit Price Review: select the same construction project in the budget book to check whether the unit price is consistent. At the same time, pay attention to the trap of splitting the project. For example, for the door package project, some companies want to attract customers at a low price, it will separate the wood project and the paint project for quotation, split the individual items look low, added together but not a little low.
Calculate the total value:
Do not think that the sum is calculated by the computer. You should use a calculator to calculate it again.
Hydropower Project:
Under normal circumstances, the power and water projects are pre-charged at the time of contract signing. After the power and water projects are completed, fees are charged based on the actual measurement. So don't think which company will receive less at this time, and we will spend less on water and electricity projects in the future. In the Budget Statement Review, the future calculation basis and calculation method should be clarified. At the same time, the design personnel should cooperate with the construction personnel before the start of the hydropower project, and the estimated expenditure of the project should be made based on the actual situation.