Soft Test Information System Supervisor: April 29, 2016 homework

First, information application system analysis design stage supervision

1. What are the entry conditions for demand analysis? Remember

A: ① owner's unit and the contractor formally signed the construction contract,

② and agreed on a preliminary project development plan.


2. What is the objective of the demand analysis?

A: The objective of the requirements analysis is to describe in depth the functionality and performance of the software, determine the constraints of the software design and interface details of the software with other system elements, and define other validity requirements for the software.


3. What are the results of the demand analysis phase? Remember

A: ① project development Plan, ② Software Requirement specification, ③ Software Quality assurance plan, ④ software configuration management plan;

⑤ Software (Preliminary) validation test plan; ⑥ user's first draft of manual.


4. What are the entry conditions for the software outline design phase? (Remember, and understand: Add the outline 2 words, the answer is the same)

A: ① project development Plan, quality assurance plan, configuration management plan and other supporting plans through review and formal approval;

② Software Requirements specification through review;

The ③ is based on the software requirements specification as the core configuration management allocation baseline.


5. What are the entry conditions for the detailed design phase of the software?

A: ① software summary Design description through the review;

② Software Outline design description, external interface design has been included in the configuration management controlled library.


6, the description algorithm in addition to the flowchart, there are some other tools, such as which 3 kinds?

A: Pad map, PDL language, HiPo chart


7. What are the results of the software design phase? Remember

A: ① summary design Manual; ② database design manual; ③ user manual; ④ software Summary Design manual;

⑤ software detailed design manual; ⑥ software Coding specification; ⑦ Integration test Plan.


8, software engineering requirements to software quality assurance as the core, tightly grasp which of the 8 major links?

Answer: ① Software production method

② Demand Analysis

③ Software Design

④ Software production Tools

⑤ Software Testing

⑥ Verification and confirmation

⑦ Software Review

⑧ Software Management


Second, information application system implementation stage supervision

1. What is the entry condition for the coding phase? Remember

A: ① software detailed design instructions have passed the review;

② Software Detailed design instructions have entered the configuration management controlled library;

③ all the software units to be coded, the corresponding module development files have been established.


2. Unit test entry conditions?

Answer: ① complete all unit code;

② Software Unit error-free through compilation;

③ complete static tests such as code reviews.


3, integration test entry conditions?

A: ① is integrated software unit error-free through the compilation;

② is integrated software unit through code review;

③ the integrated Software Unit to test and meet the test requirements by dynamic unit;

④ integrated Software Unit has been placed in the Software Development Unit configuration management controlled library;

⑤ has the software assembly testing and testing tools required to integrate the test plan;


4. Confirm the test entry conditions?

A: ① software completed the integration test;

② software can be run;

③ All software code is under the control of configuration management;

④ already has the software validation test environment stipulated in the contract.


5, the system test access conditions?

A: ① completed and passed the Software validation test; ② All software products are under the control of configuration management; ③ already has a software system test environment.


6, the focus of the commissioning phase of supervision? Remember

① assists the owner and the contractor in the handling of all issues arising during the commissioning of the system and records

② for some recurring problems, in the acceptance test to give the necessary attention, urging the contractor to resolve the necessary measures

③ supervise and inspect the training work of the contractor's trial operation stage


7, the focus of technical training supervision? Remember

① supervise the contractor to develop the training plan according to the contract and the owner's request

② Audit the operability of the training plan, require the training program to clear the target, training materials, training time, training methods and training of teachers;

③ supervise the implementation of the technical training Plan, evaluate the training materials and teachers, and inform the owners of the Training Plan implementation and effect.


Supervision of the acceptance stage of information application system

1. What are the prerequisites for the acceptance of the information application system? Remember

A: ① has passed the computer software to confirm the test review;

② has passed the system test review;

③ all kinds of documents stipulated in the contract or the annex of the contract;

④ software products have been placed under configuration management;

⑤ other acceptance conditions stipulated in the contract or the annex to the contract.


2. What are the working steps for acceptance? Remember

A: ① put forward the application, ② make the acceptance plan, ③ set up the acceptance committee, ④ the acceptance test and configuration audit,

⑤ Conduct acceptance review, ⑥ form acceptance report, ⑦ handover product.


3, the information application system acceptance can be divided into which 2 large parts? What can the order be divided into?

Answer: Software configuration review and acceptance testing

The order can be divided into: Document Audit, source code Audit, configuration script audit, test program or script audit, executable program audit


4. What are the main development documents?

Answer: ① requirement manual

② Summary Design Manual

③ Detailed Design Manual

④ Database Design Manual

⑤ test Plan

⑥ Test Report

⑦ Program Maintenance Manual

⑧ Programmer Development Manual

⑨ User Operating Manual

⑩ Project Summary Report


5. What are the main management documents?

Answer: ① project proposal

② Quality Control Program

③ Configuration Management Plan

④ User Training Program

⑤ Quality Summary Report

⑥ Review Report

⑦ Meeting Minutes

⑧ Development Progress Report


6. What are the prerequisites for acceptance testing? (i.e., what work is generally done before the user acceptance test?) )

A: ① software development has been completed, and all resolved the known software defects;

② Acceptance Test Plan has been reviewed and approved, and placed under the control of the document;

③ Review of the requirements specification has been completed;

④ Review of the summary design and detailed design has been completed;

⑤ The code review of all critical modules has been completed;

⑥ Review of unit, integration, system test plans and reports has been completed;

⑦ all the test scripts have been completed and executed at least once, and passed the review;

⑧ Use the Configuration management tool and the code is placed under configuration control;

⑨ software problem processing process is ready;

⑩ has developed, reviewed and approved acceptance test completion standards


7. How to deal with the failure of acceptance?

A: The contractor shall revise the relevant questions as soon as possible according to the acceptance evaluation opinion.

Re-acceptance or transfer to contract dispute processing procedures.


8. What are the supervisory measures for system handover?

A: ① review the list of project information of the units to be constructed;

② assist the owner and the contractor to transfer the project information;

③ ensure consistency of software documentation and software;

④ development software To do backup, storage in a safe place, file material archiving.


9. What are the supervision measures of the system guarantee period?

A: ① supervision of the contractor according to the "contract" provisions of the timely system to ensure that the implementation of the system guarantee checks;

② to record the quality issues raised by the project owner;

③ urge the contractor to repair and maintain;

④ to confirm the contents of the repair of the contractor.



April 29 Supervisor's Course assignment

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.