Many times, we need to get the raster data of the vector data region corresponding to the cell statistics (averaging, summing, etc.), and then assign the obtained statistics to the vector layer's attribute table, in ArcGIS operation as follows: (PS: The first time to write technical articles, hope that we have a lot of understanding and support, the DA) 1, Raster Statistics: Statistics raster data, as required (sum, average) with the required vector data (vector target layer) to statistics, (note: Considering the statistical analysis is more common, the first step is not an instance). 2. Raster-to-vector: Converts a statistical raster layer to a vector point layer: Raster to points:
3. Vector Point Layer Assignment: Assigns the raster layer cell value of the first step to the vector point layer of the just second step conversion: Extract values to points:
4. Layer Space Association: the point layer with the Raster cell value attribute from the third step is associated with the vector target layer (the vector layer used in the first step): Spatial Join:
5. Conversion succeeded: A raster layer's cell value attribute field in the target layer's attribute table
ArcGIS Statistics Raster cell values and convert to vector layers