1. The project life cycle refers to the time span from project initiation to completion of the project, including the conceptual phase , the planning phase, the stage, and the project closure phase.
In 2.Microsoft Project 2007, the system default item calendar is calendar.
The views of 3.Microsoft Project 2007 include three types: chart and graph view, ____________ view, and Form view.
In 4.Microsoft Project 2007, any task with a duration of 0 is automatically displayed as _____________.
5.Microsoft Project 2007 filters can be categorized into three categories: standard filters, interactive filters, and ___________ filters.
6. Resources are used in any project, and resources generally include __________, equipment, materials, cash, etc.
7. There are two categories of time difference: Total time difference and _____________ time difference.
8. The duration of a summary task is not a summation of the number of subtask durations, but is equal to the ______________ that all subtasks actually span.
In 9.Microsoft Project 2007, the system default task "priority" is __________.
11. In the company's product development process often set up some ____________ as the progress of monitoring points, assessment points, review points.
12. Assigning Resources to tasks is actually assigning costs to tasks.
13. If the assigned task type is fixed duration, the allocation of additional resources will _____________ the unit value of the resource.
The view of 14.Microsoft Project 2007 displays information about each resource in an analog spreadsheet.
15. The total slack is the amount of time a task can be delayed without affecting the completion of the ____________________.
16. The system of project management is a kind of ______________________ responsibility.
17.Microsoft Project 2007 can assign resources to each task. A resource can work on ______________ at the same time, and a task can be done by a number of resources together.
18. In the Microsoft Project 2007 system, the total cost of the project consists of three parts: the cost based on the rate, the cost per use, and the ______________ cost.
19.Microsoft Project 2007 can find overallocated resources in the ______________________ view that shows information such as the total working time of each resource, the total working time of the resource on each task, and the overallocated resource being highlighted.
21. The object of project management is cost, quality, ____________, scope.
22. When you create a new project plan document, you need to enter the project's start time or end time as a ________________ for the project plan.
23. The first step in project management is to _____________ the product.
24. The effort-driven schedule calculation can only be applied after assigning the first _____________ to a task.
25. When a resource is allocated, the _______________ of the task does not change when new resources are added to or removed from the same task.
26. In the Gantt chart, each bar chart represents a task, usually marked with a timescale above the bar chart, with the ____________ of the bar chart representing the time span.
27. Tasks that comprise and summarize the subtasks of subtasks become _______________ tasks.
28. Resource calendars, resource rates, resource notes, and so on, which are information that cannot be entered directly on the resource sheet, and are only entered in the resource information ____________________.
29. For the project successor task, the system default limit is all task _____________________.
31. People and equipment that spend time on tasks are called ______________ resources, and material resources are expendable items used to complete tasks.
32. If the assigned task type is fixed work, assigning additional resources will _____________ the task duration.
33. To optimize a project's resources, the first task is to identify ______________ allocated or allocated resources, and then optimize them.
34. Optimize the project time plan, shorten the project duration, is to ask us to be as far as possible those with the longer time difference task the jet lag shortens, the resource deploys to the ______________________, achieves shortens the duration the goal.
35. The cost of a subtask is the sum of the ________________ cost of the subtask and the cost of the resource used by the child task.
36. The duration of the summary task is equal to the time period that all ___________________ actually spans.
37. The duration of the task is calculated by ___________________ and the amount of resources.
38. To shorten the project's duration first, start with the ________________________ of the project.
39. If the project file can only be opened as read-only and cannot be modified, the project file has a read-only password, and if the project file is open and can be modified, the project file is set with a password.
41. Task A must be completed before task B begins, and task A is the task B , and Task B is a successor to task A.
42. A task is originally a summary task, and the task becomes a demotion operation.
43. Task armor uses an effort-driven calculation schedule, then the type of task A is.
44.Microsoft Project 2007 The default time unit is day, and hours are expressed.
The views of 45.Microsoft Project 2007 are divided into task class views and ________________ class views.
46. In Microsoft Project 2007, resources can be divided into work resources and __________________ resources.
47. In Microsoft Project 2007, you can use ______________ to adjust the amount of time a resource spends on a task.
48. Before you start tracking progress, you need to set up _________________________ to compare this information to the latest information on your project.
49. In Microsoft Project 2007, you cannot set a single character in the format, only in _________________.
51. The core areas of project management are scope management, time management and ________________ management.
52. In Microsoft Project 2007, the template file has an extension of MPT, the project document has an MPP extension, and the work environment file has an extension of _____________.
53. The project plan is a _______________ task arrangement for the completion of the project objectives.
54. Milestones are used to identify important items in the schedule, with a duration of ___.
55. By default, when you add a task to a project that is scheduled on a start date, Microsoft Project 2007 automatically assigns a "______________________________" limit.
56. The resources in the project refer to the ___________, equipment and materials used to complete the project.
57. In Microsoft Project 2007, each project document can have a maximum of __________ medium-term plans set.
There are 3 types of tasks in 58.Microsoft Project 2007: Fixed units, fixed work, fixed ________________.
59. There are two types of jet lag: free time difference and _________ time difference.
61. A project is a __________________ task that has a specific goal in order to complete a particular product or service under certain constraints (mainly limited funds and time limits).
62. By default, when you add a task to a project that is scheduled for a finish date, Microsoft Project 2007 automatically assigns a "______________________" limit.
In 63.Microsoft Project 2007, there are different types of task restrictions.
64. The amount of slack is due to the time difference between the critical path and the non-critical path, which results in some tasks having some _______________ on the schedule.
65. Project costs fall into two main categories: _________________ cost and fixed cost.
66. By viewing the _____________________ data, you can analyze the difference between the actual and planned conditions of the project from the start date to the status day.
67. In Microsoft Project 2007, a maximum of ________ baselines are saved per project.
68. In the implementation of the mandate, some staff members may be interrupted by unforeseen circumstances, and the cost should not be calculated at this time and ______________________ processing is required.
69. When you assign a new work resource to a task or remove a resource from a task, Microsoft Project 2007 increases or decreases the task duration based on the number of resources assigned to the task, but does not change the total work for the task. This scheduling method is called the __________________________ schedule control approach.
71. The project breakdown structure (WBS) decomposes the project as a whole systematically into several working ___________ that have an intrinsic connection.
72. Use the ____________________________ of the resource in Microsoft Project 2007 to identify the availability of the resource.
73. When scheduling with effort-driven, assigning additional resources will _________________ task durations if the assigned task type is fixed work.
74. The elements of the network diagram include the Tasks of the network, and the "three elements" of the line.
75. Use PERT analysis to estimate the duration of a task, that is, after you have specified optimistic durations, _________________ durations, and pessimistic durations for tasks in your schedule, calculate the weighted average of these 3 durations through Microsoft Project 2007.
76.Microsoft Project 2007 's Custom report types can be divided into four categories: task class report, __________________________, monthly Calendar class report, and cross-analysis class report.
77. The project document includes text, bar charts, and __________________, and the user can reformat the 3 components to beautify the document.
78. If you want a task to complete on a specific date, but you do not want to constrain the task with restrictions, you can set a ___________________ for the task at this time.
79.Microsoft Project 2007 provides a number of visual reports in predefined formats that can be divided into six categories: assignment usage, Task Summary, resource Summary, assignment Summary, _________________ allocation status, and resource usage.
Case exercises (Basic concepts in the blanks)