Preface: Today to collate information, found a few years ago I encountered a patrol fault, so take out to do record, to avoid data loss. first, warning phenomenon:

1: 6509 main engine SYSTEM light Red

2: 6509 chassis back line integrated Board light Red

Second, the device hardware indicator level analysis:


Cisco official for the main engine,the system lights up Several cases of the description:

Green-all Chassis environmental monitors is reporting OK.

Orange-the power supply has failed or the power supply fan hasfailed.

Red-incompatible power Supplies is installed. (power supply Exception)

– The redundant clock has failed. (redundant clock exceptions)

– One VTT1 module has failed or the VTT module temperature minorthreshold have been exceeded2. (Piece VTT Module exception, or VTT module temperature abnormality)

– VTT modules fail or the VTT module temperature major Thresholdhas been exceeded3. (Two pieces VTT module exception, or temperature abnormality)

– The temperature of the Supervisor engine major threshold has beenexceeded(engine temperature anomaly)


Three, equipment system alarm Level analysis:


6509 has the following alarms:

Environmental alarms:

System minor alarm on operating VTT count (raised 18w1d ago)

System minor alarm on VTT 2 OK (raised18w1d ago)

Four, equipment system level analysis:


View 6509 hardware status with the following status description:

VTT 2:

VTT 2 Ok:not OK

VTT 2 outlettemperature:29c  

Description VTT2 module System detection status is not normal

VTT: Voltage terminal module, for Catalyst switching bus. If the redundant Supervisor engine is not installed and the VTT module is in a low or severe temperature condition, the system shuts down. There are three voltage regulators (VTT) on the back panel. If a VTT module fails, a slight alarm will occur. If two faults occur, a major alarm will occur, and the correct action is to shut down the system


V. Conclusion:


the 6509 chassis backplane,VTT2 voltage terminal module anomalies, and now the system still has 2 blocks VTT Module normal operation, if a piece of VTT Voltage Terminal module Abnormal, will make the system serious alarm, if the situation is serious can cause the whole station 6509 stop working.

a 6509 can withstand only 2 blocks of VTT module exceptions.


This article is from the "Frozen vs watermelon" blog, so be sure to keep this source http://molewan.blog.51cto.com/287340/1891370

Cisco 6509 chassis back red light analysis report

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.