From: http://www.solnis.com/article/Digest/282.html
A long time ago I want to order how to smoothly EO-1's Hyperion image well write a summary, helpless people too lazy. I decided to solve this problem today when I was forced to consult with many colleagues.
EO-1's geographic data acquisition system is a new type of Earth observation satellite developed to replace Landsat 7. It is also an experimental hyperspectral satellite.
Order of Hyperion
Step 1: Website
On the http://eo1.usgs.gov/DARInstructions.php, open DAR Form.
Step 2: site LAT/long: it is best to specify the center of the range. (L1-level Hyperion image: 7 km in width and 42 km in length ).
Step 3: Pointing Mode: You can select west, east, And Nadir based on your needs.
Step 4: Scene length: there is no need to say that L1 is only 42km.
Step 5: Select media type: If you can link to the Internet, FTP (the download speed of the Emy of Sciences is quite fast). It saves 20 dollars and the speed is faster than that of the DVD.
Step 6: Acquisition window: if the time window is set properly, you can save a lot of money and the time period can be as long as possible.
Step 7: Use Acrobat to print the webpage as a PDF file before submit form.
Step 8: after submitting the DAR Form, wait for the USGS staff to contact you. (Shella ?) They will send you an email to tell you how much you need to pay.
Step 9: Make an external payment in RMB. It is best to select wire transfer. A wire transfer account needs to be obtained from USGS's staff first. If he doesn't give it to you, he can only send an email to ask for it. Although I have a wire transfer account, do you know if they will change to another account?
Step 10: remittance is quite troublesome. A pile of chapters need to be covered (the signature of the mentor, the Unit chapter, and the leadership chapter ), A pile of forms should be filled in (the name and address of the organization in Chinese and English, the code of the organization in the external bank, and so on). After filling out the receipt form, you must copy the backup. Don't be reluctant to spend such a small amount of money.
11th. It is recommended that you pre-purchase the input DAR Form image for 35 days in advance.
The entire ordering process is complete. Based on my experience dealing with Shella, there are a few other things:
1. Make a paper or electronic record by yourself. The more detailed the record, the better, including DAR Form PDF printing, the date on which the wire transfer is handled, and the date in the order time window, the actual amount of USD spent, DVD mode or FTP mode.
2. She often sends an email to Shella, urging her not to forget her order time. The Shella hero seems to have no soul on her body and is a very small model. Send an email to Shella a few days before the date you need most, especially for the ground synchronization test. She needs to be able to tell you in advance the most accurate transit time for the next day's epoch.
3. Be sure to invoice (invoice). Which day do you want the DA?You must clearly tell him that you need invoice. They reported an electronic invoice, which was printed and used for financial report. Without such an invoice, they could not report the report.
4. As mentioned above, the ordering window should be as big as possible because we can buy the desired images cheaply (to drill down the old Midea ).
First, we will analyze the price list for purchasing images, which is divided into four parts:
$750 (required programming shooting cost) + $250 (L1 level image) + $5 (processing cost) + $20 (DVD, you can select ftp mode to save)
Once our order is submitted and confirmed, we will need $750 to pay for the program shooting of the track. This $750 has nothing to do with the image we bought. In this program, the satellite may take image data for several days for us to choose from. If one scene is needed, we will pay 255 US dollars. If another scene is needed, you only need $255. This saves a lot of money (N-1) * $750 ).
1st order
$750.00 Hyperion service quota (42 km)
2nd Order
$250.00 Hyperion daTA product (l1r)
$20.00 International Shipping failure
$5.00 handling
1) HyperIon ImageTrack problems:
Look AngleS and coverAge Area
HTTP:// EDCSns17. Cr. uSGS. gOV/EO1/looKanglEs. pHP
(2) HyperIon ImageAbout the transit dateQuestion:
EO-1 acqui.SitioN schedUle
HTTP:// EDCSns17. Cr. uSGS. gOV/EO1/ACQUisitIon. pHP
Date is a regularLaw, use EXcelMake preparationsTest, not necessarilyNon-use prediction soft.
(3) HyperIon ImageWrs2:
ConveRters&ShapeFiles
HTTP:// LANDSAT.USGS.GOV/TOols _CSF. pHP
Disclaimer: This article is reposted on the Internet. The source is unknown. If you have any copyright concerns, please contact me!