This topic mainly introduces several kinds of enterprise's attendance way: Standard attendance way, free class way, abnormal registration type. In the system empty database is built-in good.
The similarities and differences of several attendance modes:
Note: The specific settings for each type of attendance are described in detail below.
1. Standard Attendance
Business Introduction
Standard attendance refers to the attendance results according to the schedule, the transaction and the punch-out three factors participating in the attendance calculation.
Take our company for example: work date, commuting time is fixed, staff leave, field, etc. through the staff application to complete; In this way, the standard attendance method can be used.
Operation Steps
1. Scheduling
2. Business
3. Punch-In
4. Attendance calculation and attendance result
2, Free class attendance
Business Introduction
Free attendance means that employees are not stable and do not want to work overtime, the final real attendance is calculated according to the actual time of commuting. In our system, the attendance results are obtained according to the schedule, punch-in, and the adjustment single participation attendance calculation.
For example, the Assembly workshop: Their commute time may be based on the customer's order number changes frequently; This way you can use free attendance.
Operation Steps
1. Scheduling
2. Business
3. Punch-In
4. Attendance calculation and attendance result
Precautions
1. Free class template in the attendance rules, does not include late, leave early, attendance results do not include absenteeism.
2. In the free class template, the attendance rule ignores absenteeism, and the actual attendance is calculated by punch-in.
3. The team shifts in the Free class template are "working".
4. Use adjustment orders to record employee abnormalities (late arrivals, early departures, absenteeism).
3, abnormal registration type Attendance
Business Introduction
Abnormal registration means that employees do not need to punch in and do not need a business application, and ultimately by the personnel through the adjustment of single records employee transactions and exceptions. In our system, it is according to schedule, adjust single participation attendance calculation to get attendance results.
Operation Steps
1. Scheduling
2. Adjustment order
3. Attendance calculation and attendance result
Precautions
1. Select "Hand-made attendance results" on the team using this method.
2. Start the swipe and end swipe in the shift list on the schedule template is not selected.
3. Use adjustment orders to record employee transactions and exceptions (late arrivals, early departures, absenteeism), etc.
Attendance-Several Attendance solutions