Gantt Chart Control 2.0.0.5

Source: Internet
Author: User

Finally, some new functions have been added for controls of Version 2.0. Please correct some of the original bugs. In version 0.5, the most important update is to add a task group, and the task entries in the same group can be dragged to each other. Another important update is that when the task bar displays the progress of the current task, in addition to displaying the progress in color, it also displays the percentage of the progress in the task bar with numbers, in order to save the space for displaying numbers and ensure the clarity of numbers, some special technologies are used to "pixel" All numbers. So now, in any system, the digital display is perfect. All functions are updated as follows:

 

New Feature

    • Clicking the task bar will automatically select the current row in the table area.
    • Modifying data in the table will be synchronized to the task object
    • A floating prompt box is displayed when the task bar is dragged.
    • You can move the current position of a view by right-clicking the blank area of the chart.
    • Added the ongetcandrag event to dynamically control whether to allow dragging of task entries. The corresponding demo is added.
    • Added the ongettaskbarcolor event, allowing you to dynamically set the color of the progress bar in the task bar and task bar.
    • The showprogressbartext attribute is added to the appearanceobj style attribute to set whether to display the current progress number.
    • Use the pixel font to optimize the display of progress bar numbers
    • The task bar control adds group settings.
    • This feature enables tasks to be grouped and dragged between groups.
    • You can press the Shift key to move all the tasks following the current task bar together.

Fix problems

    • Fixed the bug where the task bar could not be moved or dragged to the original position or size when it was moved or changed by hours.
    • Modified all demosProgramTo display Chinese characters.
    • Fixed the bug where the demo program was displayed in English in the task bar.
    • The bug that the table indicator and time scale dashes are inaccurate in Windows with no theme is modified.

Demo program (click to download)

Http://www.kuaipan.cn/file/id_4197261084988033.htm

 

Program

 

 

 

 

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.