Standard for construction of a class of special room

Source: Internet
Author: User
I. Scope of application

L Class A data center room

L Class A data center computer room basic function, civil construction Two, establishment condition

1. System Type

L Real-time access is strong

• For large factories or companies

L users are concentrated in the LAN

2. Number of systems

L at least 1 application Systems

L have a good expansion, follow the business development, can be expanded into a set of systems

3. System Coverage

L This factory or company

L users are concentrated in the LAN

4. How users access

L Access via LAN

Access mode according to the system agreement, the need to ensure access to the convenient, safe

5. IT Staff

L can have no IT personnel

L supported by the relevant technicians

6. number of companies

L only a company using this room

L This room is not a shared room

7. Number of users

L at least 30 users

L The number of users has no limit three, notice matters

L The daily Operation maintenance standard of machine room is unified

L This standard is suitable for the environment construction and function construction of the computer room, and the building of the data center room without comprehensive wiring

L all running software in engine room needs to have legal license (OS, DB, application, business system, etc.)

L This standard only involves the content which needs to satisfy, regarding the realization way as well as the material selection may carry on according to respective actual situation four, basic function

1. Data Backup

L need to set up a data backup system, the application system data will be backed up and retained regularly

L Regular recovery mapping is required for data backed up for retention

L backup media is not limited to tape, only to meet the intent of data backup

2. HA

L Choose according to the actual situation

3. Data Upload

L The room needs to have a certain bandwidth, to ensure that the data backup can be uploaded to the core room regularly

L data uploads will be implemented over the Internet

4. Disaster Backup

• Disaster backup room as the core room

L Special room needs to perform the daily operation of the disaster backup requirement, and cooperate with the core room to ensure the execution and reliability of the disaster backup. Civil Standard

1. Set Capacity

L first need to set a good room capacity

L capacity = number of standard servers to run

L Set Standard Server values: weight, power consumption, heat dissipation, height

L devices or servers that do not conform to standard servers can be converted to a multiple of standard servers according to the manufacturer's instructions (e.g. 2 standard servers, 0.2 standard servers, etc.)

2. computer room area

L according to the capacity, as well as other ancillary equipment, according to the actual computer room area

L Cabinet, UPS and other equipment placed in the room, all need to keep the heat, access, repair space

If there is a cabinet-style independent air conditioning, then need to set the air conditioning indoor machine placement Position

l Because all the equipment is basically square, if there are irregular rooms in the room, it may lead to waste area, that is, the need to increase the area to display equipment

3. Room Location

L engine room away from elevator shaft, strong electric shaft

L machine room away from water and water pipelines, the machine room above or next door can not exist water pipes

L The best room without windows, at the same time the computer room without large interference source (air-conditioning host, transformers, launch towers, high-voltage transmission lines, etc.)

L The location of the machine room is far away from the Yang Ash area and the surroundings cannot damp

L no vibration source around the machine room (railway, large freight road, mine, etc.)

4. load-bearing

L CALCULATE the basic weight of the engine room according to the capacity of the computer room, the equipment to be placed and the number of maintenance personnel

L The load-bearing capacity of the engine room needs to be larger than the basic weight

5. Ground

L The machine room needs to have excellent ground wire

L Use this line for grounding all equipment

6. Electrostatic

L The room needs to have electrostatic grounding

L cabinet and possible static electrostatic objects that need to be connected to electrostatic grounding

7. Electricity Arrangement

L must be a server (UPS), lighting, air-conditioning, other non-server equipment power

L Server electricity needs to be based on the capacity of the computer room, as well as the standard server power consumption to calculate (standard server consumption x computer room capacity + network equipment consumption + cabinet power consumption + power consumption of other equipment)

L for non-server electricity such as lighting and air-conditioning must be considered separately

8.

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.