As of today 6/18, to the Iflytek has been one months, a small report on the work done during this time 5/18
- Into the job, according to the new training program to learn the corresponding content, mainly including corporate culture training, technical training (RDM Bug fill specification, SVN use training, Linux Foundation, fiddler), the overall business training, special business Education Line Training Section four modules, Part of this is because the project was started from 23rd, so it was done later.
5/24
- Started to join the West project, according to the acceptance test case on the platform to learn the general function of the Xining project to participate in the unified licensing function test. Since June after the participation in the teaching of the work, so basically did not participate in the Xining Project test.
- Participate in the inspection work of Qinghai project.
6/3
- Start joining the program, learn from SVN content, and familiarize yourself with the various versions of teaching pass to learn to sign, package, and upgrade.
- 6/15 start entering the Yanshan project, familiarize yourself with the project and start testing.
The current work has not encountered too much problem, the way to mention the bug because it has been used before the same system, not very accustomed to, but now also can be familiar with the use of. Some of the details of the work flow, including bug fixes after the verification of the closing point of time, the summary of the test results, some of the company's system, and other unfamiliar places. For example, the company system, the study plan said elearning on the curriculum, but the current course offline. These things in the future work and projects, multi-directional people to make a confirmation, to avoid the error because of not understanding. communicate with AP and WZ, Next:
- Listen to the planned project test
- The teaching pass is familiar with the existing projects in turn
- Preparing for Axure's sharing activities
January record of flying into the post