Project name: Food chain Teaching Tools
Group name: Fight, brother.
Group leader: Huang Xing
Members: Li Yuxing, du Qiao Linhai, Luan Sun, Wang Donghan
Code Address: Https:https://git.coding.net/li_yuhuan/foodchain.git
SSH: [Email protected]:li_yuhuan/foodchain.git
SCRUM Conference :
Date: 2016.11.5 9:30--10:40
Venue: Lobby, first floor, Winter Wah building
Meeting content:
What's been done:
1, to solve the statistical food chain, there will be repeated problems.
2, complete the longest shortest chain to increase the text display mode.
What you plan to accomplish:
1, Huang Xing: organize to discuss this week's homework requirements, assign tasks, assist others to work, and write essays.
2, Li Yuxing: The longest and shortest chain control explicit button selection state design and drawing.
3, du Qiao Linhai: Continue to solve the frequent switching the longest chain or the shortest chain, the food chain in the flashing process of the problem of missing lines.
4, Luan Sun: To solve the formation of the whole food chain when there is a ring problem.
5, Wang Donghan: Do the meeting record, according to the new requirements to draw Burndown chart.
Hinder:
In addition to solving the existing problems, there are new bugs.
Burndown Chart
Note: 5 tasks per day, the total is 1, each of 0.2, so in the Burndown chart, the actual line from the planned straight line distance represents the unfinished workload.
Another November 3, 4th rest, so the time period is horizontal.
Tasks not completed in today's scheduled tasks: 1, the longest and shortest chain control explicit button selection design and drawing.
2. Solve the problem of annular when generating the whole food chain.
Feature List:
1. Scene Selection
2. Add mobs
3. Delete Mobs
4. Choose a biological form of expression
5. Generate food chain
6. emptying the food chain
7. Food chain number
8. Longest shortest chain
9. Add a custom mob
background Music
(Nineth week) team Project 12