Only by well managing the planned tasks can we manage the unplanned tasks.
Author: Yang Zheng | reprinted. The original source and author information of the article must be indicated in hyperlink form during reprinting.
Web: http://blog.csdn.net/yzhz/archive/2010/06/18/5677594.aspx
You can manage unplanned tasks only after you manage the planned tasks.
We often have a lot of things and can't solve them. The reason is that we didn't finish the tasks in the plan strictly according to the time point.
There is no extra time to deal with unexpected things only when the planned things are controlled in the plan. "Strict" is critical, because we often feel that there is still a lot of time, and things in the results plan are always pushed again. At this time, if the unscheduled tasks are found, the planned tasks are not completed, and the unplanned tasks are constantly appearing, so there is no time for both sides to deal with them. Therefore, if something cannot be handled, it must be that the tasks in our plan have not been completed as planned.
In a word,Accidents can be managed on the premise that we need to manage non-unexpected events.