Pay attention to the following aspects when signing the decoration contract:

Source: Internet
Author: User

Pay attention to the following aspects when signing the decoration contract:

1. Schedule: Generally, a 2-bedroom, 100-square-meter room. For simple decoration, the schedule is about 35 days. For the sake of insurance, the decoration company generally schedules the schedule to 45-50 days, if you are in a hurry, you can discuss these terms with the design.

2. Payment Method: for a general decoration contract, a down payment of 60% is agreed, 35% is paid after acceptance of woodworking, and 5% is paid after completion. If you follow this payment method, you have already paid about 95% to the decoration company after the construction period is over half. If something goes wrong in the later period, it is very difficult to restrict the decoration company in terms of money. Therefore, we recommend that you reduce the down payment to 30% and pay 30% in the middle of the contract.

Medium-term payment: The medium-term payment period agreed on in the contract, which simply indicates "over half of the project, woodworking reception ". However, a single construction site often involves multi-project cross-jobs. The formal construction period should be half: the completion of wood ware production; the completion of kitchen and bathroom walls, floor tiles, and ceilings; the completion of wall leveling; and the completion of electric transformation.

3. Increase or decrease projects: During the decoration process, it is easy to increase or decrease projects, such as creating more cabinets and changing the water circuit by several meters. These fees must be paid at the completion of the project. So what is the unit price of these projects? After the project has been started, the design may have the final say. Therefore, if possible, it is best to copy a complete quotation sheet that the decoration company initially showed you, so as not to steal the bar and change the price when you sign the contract or increase or decrease the project.

Note that, during the final settlement, the increase and decrease expenses you should pay should be signed and approved by you before the construction of the project, you may not pay the corresponding fees

4 warranty terms: the whole process of decoration is mainly made on site by hand, but it has not been fully industrialized, so there will inevitably be a variety of fine-grained quality problems. During the warranty period, the responsibility that the decoration company should implement is particularly important. For example, if there is a problem, the decoration company must make it clear in the contract whether it is responsible for the full warranty of materials, or only the contractor, not the material warranty, or there are other restrictions.

5. Water and Electricity costs: water, electricity, and gas will be used during on-site construction during the decoration process. Generally, by the end of the project, the sum of utilities is a small number. who should pay the cost? It should also be indicated in the contract.

6. Construction by drawing: the construction is strictly in accordance with the drawings you have signed and approved. If the size of the drawings does not meet your requirements, you can request rework.

7. Time and times of supervision and quality control: A general decoration company assigns the project to each construction team for completion. Quality control personnel and supervision are the most important means of supervision by the decoration company, they visit the site at intervals, especially for the quality of the project. Supervision and quality control should be conducted once every two days. The design should also be present once every 3-5 days to see if the on-site construction results are consistent with your own design.

 

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.