Preparation and construction of integrated wiring wiring

Source: Internet
Author: User
Tags prepare

The implementation design of network integrated wiring project plays a decisive role in the whole process of wiring, and the design organization should be cautious.




Preparation of
wiring before





usually network engineering after investigation, determine the scheme, the next step is the implementation of the project, and the first step in the implementation of the project is to prepare before the commencement:





(1) Design the actual construction drawing of the integrated wiring, to determine the location of wiring, you need to consider such as: concealment, damage to the building (structural characteristics), in the use of existing space at the same time to avoid power lines and other lines, the scene in the case of cable and other necessary and effective protection needs, construction workload and feasibility ( such as hitting the wall, etc., and so on, and then the drawings provided to the construction personnel, supervisors and supervisors to use;





(2) planning design and budgeting, according to the above situation to determine the route and apply for approval, if you need to hit the load-bearing beam on the wall to apply to the management department, otherwise violate the construction laws and regulations, the entire planning and destruction of the degree of information is best approved by party A and management department, followed by the revision of planning. On the basis of the formal planning of the final licensing procedures, the calculation of materials and employment, the cost of the design implementation of the management operation and so on to propose budget and duration and construction plans and arrangements. The degree of coordination of the user side needs to be considered in the implementation plan. The implementation of the program needs to negotiate with the user to endorse the signature, and designated coordination responsible personnel designated project leader and engineering supervision personnel, responsible for planning preparation, maintenance, user side of the requirements and other aspects, put forward the timetable for each department, responsible for internal and external coordination and construction organization and management on-site construction site certification test Make the test report and make the wiring marking system.





Network Engineering Construction process requires a lot of construction materials, some of these materials must be prepared before the start of the material, and some can be in the process of preparation, the main cable, twisted-pair, sockets, information modules, servers, power supply, hubs, such as the implementation of purchase manufacturers, and to determine the date of delivery, different specifications of the plastic slot board, PVC Fire HOSE, snake skin pipe, tapping screws and other wiring materials in place, if the hub is centralized power supply, then prepare the wire, iron pipe and the establishment of good electrical equipment safety measures, the development of construction schedule.





Construction Notice




The implementation design of
network integrated wiring project plays a decisive role in the whole process of wiring, and the design organization of the project should be cautious. There are a few things to keep in mind:





(1) In the implementation of design should first pay attention to the standardization of standards. The implementation design of structured wiring should not only be rigorous in design, satisfy the user's requirement, but also make its cost reasonable and conform to the standard of standardization. International and domestic structural wiring has strict regulations and a series of standardized standards, these standards for the structural wiring system in all aspects of a clear definition, set its design requirements and technical indicators.





(2) is designed according to the actual situation. First of all, the construction of the building to carry out a full investigation, to collect the building construction, decoration works and other related engineering drawings, and fully consider the user's construction investment budget requirements, application requirements and construction schedule requirements and other factors. If the building is still in the process of establishing a structured wiring scheme, it can be based on the overall layout of the building, the demand for the line to the design of the structure of the construction of the specific requirements of the structural wiring, in order to be in the construction of some wiring at the same time the Prophase project completed. If it is on the basis of the original building with the Interior decoration Project synchronized implementation of the wiring works, it must be based on the original building, decoration engineering design and the actual survey results of wiring implementation design.





(3) should pay attention to material selection and layout. The material materials and layout arrangement in the design of wiring implementation have direct influence on the construction cost. In the design, according to the needs of network construction institutions, select the right type of wiring cable and connectors, the selected wiring material grade of different to the overall programme technical indicators have a great impact. Besides the direct influence on the construction cost, the design of the layout arrangement also related to the network wiring is reasonable, for a multi-storey building, the installation of the entire building network backbone Switch Center network room, preferably set in the middle of the building floor, if the various floors set wiring between the best set in the middle of the floor, This design not only can shorten the vertical and horizontal backbone subsystem wiring length, save materials, reduce costs, but also reduce the unnecessary channel transmission distance, conducive to the improvement of communication quality.





(4) Also need to pay attention to the construction site supervision staff to be serious and responsible, to deal with various situations appearing in the construction process in time, and coordinate to deal with the opinions of all parties; If the on-site construction encountered unforeseen problems, should be timely report to the engineering unit, and put forward solutions for the project units on the spot to solve, lest affect the progress of the project; The problem of poorly planned engineering units, should be timely and properly resolved, the new additions to the engineering units should be reflected in the construction drawings in time, to the part of the site or section to be timely inspection and acceptance, to ensure the quality of the project, it is best to work out the project schedule, but in the formulation of the project schedule, to leave room It is also necessary to consider other projects in the construction may bring about the impact of the project, to avoid the failure to finish on time, the completion of the issue, therefore, it is recommended to use supervision to assign task tables, workshop construction table.





and at the end of construction, should also pay attention to cleaning up the scene, keep the scene clean, beautiful, to the wall hole, shaft and other junction to be repaired; all the remaining materials are aggregated, and the remaining materials are placed in one place, and the quantity that can be used is registered, and the summary material: Start report, wiring Engineering drawing, construction process report; Test report, use report and acceptance report for project acceptance.


Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.