Project time (estimated project activity duration and planned preparation) Notes

Source: Internet
Author: User

The estimation of the project activity duration is to make a correct estimation of the duration required to complete the project activities based on the existing environment conditions. The time and resources required for each project activity need to be estimated separately. The core of this process is the basis for cost control and progress control.

Main tasks of estimating the project activity duration

Input

Tools and methods

Output

Activity list

Resource requirements

Historical data

Expert suggestion

Analogy Estimation

Delphi Method

Simulation Method

Simulation Method

Estimated project Activity Duration

Reference document for estimation

Updated activity list

Half of the Project Activity Duration Estimation steps

1. Enter original data and empirical data and establish estimation assumptions.

2. Use corresponding estimation tools and methods to estimate each specific activity

2.1 estimate the duration of each activity, average resource utilization, total working hours (or costs), and non-human resource demand costs.

Project Activity Duration Estimation type

1. approximate estimation

2. Preliminary magnitude estimation.

3. Estimate the budget.

4. detailed estimation.

Estimated Influencing Factors

1. Emergency Prediction

2. personnel proficiency and work efficiency

3. Personnel communication and other factors

In the actual estimation process, there are also some other factors, including the loss time consumed by non-project activities, the impact of part-time work, the loss of communication and conflict when people complete their work.

4. Detailed levels of activities

Input of Project Activity Duration Estimation

1. Resource requirements generally include personnel, raw materials, equipment, and funds.

2. Resource allocation. Note: resource efficiency or productivity, resource availability, and resource uniqueness.

Historical data

1. project documentation

2. Estimated commercial time Database

3. Focus on the wisdom of the project team.

Tools and methods for estimating Project Activity Duration

Time, cost, resource estimation

Key Content: Estimation steps and methods. Resource load diagram.

Methods: Expert estimation method, analogy estimation method, Delphi method, and three-point time estimation method.

Expected activity value = the most optimistic time + the most likely time * 4 + the most pessimistic time)/6

Standard variance = (pessimistic time-Optimistic Time)/6

 

Schedule Development)

Based on the work breakdown structure, the output results and required resources are estimated based on the definition, sorting, and duration of the activities in the previous project time management process, prepare a series of progress plans for all activities of the project, which are the service objectives and objects that the project follows up with and control, and the action guides for project follow-up and control, A good project progress plan should be conducive to the implementation of project tracking and control and the realization of project objectives.

Main work of preparing the project progress plan

Input

Tools and methods

Output

Project Network Diagram

Project Resource requirements

Activity Duration Estimation

Activity logical relationship

Constraint factors

Activity advances and lags behind

Calendar

Gantt Chart

Key Path Method

Plan Review Technology

Chart Review Technology

Project progress plan

Supplementary description of project progress plan

Project Progress Management Plan

Constraint factors

1. Mandatory date

2. Key events or milestones

A time constraint type project must be completed within the specified time.

A Resource-constrained project assumes that the resource availability level cannot exceed the required usage of the project.

Tools and methods

1. Gantt Chart: The biggest advantage is that it is simple, clear, intuitive, and easy to compile. The main disadvantage is that it cannot reflect the logical relationship or dependency between project activities in the same way. It is applicable to relatively simple small projects.

2. Key Path Method

Plan Review Technology

The probability time estimation method is used to estimate the length of project time based on the optimistic, most likely, and Pessimistic Activity Duration.

Expected activity value = the most optimistic time + the most likely time * 4 + the most pessimistic time)/6

Standard variance = (pessimistic time-Optimistic Time)/6

Chart Review Technology

 

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.