Project time period Summary: (one month of development cycle)
1. For the first time in September 8, I discussed the requirements with the customer.
2. At ten o'clock A.M. on April 9, September 15, I received a phone call from the manager saying that the customer needed to provide a basic architecture demonstration in the afternoon. I took two hours to ask the artist to help with the presentation, use the existing architecture to complete basic system management functions and demonstrate them.
3. the design, development, and self-test phases of the system are tense from October 23 to October 23 (one day of overtime on October 17)
4. Presentation to the leadership of the competent authority on April 9, September 26
5. From October 11 to October 9, according to the user adjustment, testing, and manual stages (holiday as usual)
6. Presentation to the supervisor on April 9, October 10
7. Preparations for the second round of tests and training materials since January 1, October 10
Project Team Summary: (two months)
Project Manager: Jia Shiyi's rich experience in software development and project management
Developer A: rich experience in software development: October 31-October 31
Configuration personnel a: rich experience in configuration and maintenance work cycle: One day, January 1, September 17
Artist A: Support for sporadic image modifications on October 1, September 16
Data entry and testing personnel A: O & M personnel who do not understand software, maintain data and test cycle from January 1, September 26 to the present
Function implementation summary:
1. the system management function is ready-made. You only need to adjust the Chinese characters of the field names in XML according to your needs (System Management has four functions implemented on a separate page)
2. More than 50 functional points are managed, queried, and analyzed in the system, all of which are implemented using xml configuration.
3. add, delete, modify, and query of business data in the system. A total of more than 10 function points should be configured in XML as much as possible (three functions are implemented on a separate page)
4. Detailed information is displayed and printed in the system. For more than 10 functional points, xml configuration is used.
A total of 76 XML files are configured, and 2 HTML templates are printed.
From the above summary, it is not difficult to see the advantages of configuration implementation:
1. quickly build an Information Management Platform required by the customer and present it to the customer
2. Adapt to the changes made by the customer, and facilitate addition and adjustment.
3. save time and manpower
You can use the configuration to summarize the functions:
1. List (Management list, query list, statistics list, and chart. Deletion can be configured on the list)
2. Details
3. Print and export data in Excel
4. import data such as Excel and text
5. Edit (for adding or modifying a table, you can view other table data or hide and process other table records)
6. workflow and task form (this project is not used
Welcome to: http: // 121.18.78.216, which is a demonstration platform for ease of query and analysis, workflow, content management, and project management.