Yesterday Mission list |
Tomorrow Mission list |
Liu Hu |
Scheduled tasks: (not completed)#128 Learn how to automatically build and attempt to deploy test files on GitHub and test them automatically on each push
- This task should have been done, but because of network reasons today Travis-ci can not connect, so although and GitHub has done a binding, but failed to test successfully. Tomorrow will solve the problem ~
- So today I finished another task, sorting out all the scattered functions into a set
#157Finishing of scattered functions and module regularization |
#128 Learn how to automatically build and attempt to deploy test files on GitHub and test them automatically on each push. |
Harrison He |
#129 Write an experimental interface that contains the following interface content:
- Experimental data processing function interface
- Experimental XML file Processing interface
- Experimental Unit test Function interface
|
#147 1022 of the Experimental data Processing section. https://github.com/buaase/Phylab-Web/issues/147 |
Huang Yumeng |
Team member's birthday, leave, but still participate in the scrum meeting |
#148 (Task change) 1022 data-independent latex |
ISSN |
#131 (not completed) forget password and send email. |
#131 forget password and send mail. |
Lu Yu |
#132 Forum interface prototype design. The difficulty and difficulty encountered:Android Big job 12.15 days need to reply, compile not finished. Design needs inspiration ah ... It's not going to work out two days a day. |
#132 Use Mockupbuilder to design the Web prototype interface of the Physics Experiment Forum, keep the style of concise atmosphere as far as possible, and keep the same style as the previous page. |
Yan Ting |
#133 (not completed, today's leave) In order to ensure the correctness of the test, it is necessary to extract the test data from some correct reports. The results of the test report need to be checked manually, and the test data in the report is extracted. |
#133 In order to ensure the correctness of the test, it is necessary to extract the test data from some correct reports. The results of the test report need to be checked manually, and the test data in the report is extracted. |
Daily Data statistics:
|
Browse Times |
Independent visitors |
Ip |
New Independent visitors |
Number of visits |
2015/12/13 Daily Data |
40W |
93 |
80 |
22 |
168 |
Cumulative data as of 2015/12/13 |
15177 |
2776 |
2387 |
|
|
Cumulative Registered Users |
36P |
Stand-up meeting photo record: (photographer: Harrison He)
Burndown Chart:
Completed work record:
Harrison He task: HTTPS://GITHUB.COM/BUAASE/PHYLAB-WEB/COMMIT/58EEDD883E83958F14366E7886E82662D7E51AEF (commit record)
Liu Hu Task: https://github.com/buaase/Phylab-Web/commit/634278ecc4881f5f59eda37573b3e82aef927889 (commit record)
Some thoughts from the project manager:
In fact, we originally wanted to start iterative development at number 12.11th, but unfortunately, we didn't. The limiting factor looks very small, as if it were just a block of compilation. But in fact there will be the coming database course, compiling test, database test. This year our exam is a lot of empty, no exams, but the matter, we all crowded together. I was very interested in registering for the big game, but the final thought carefully, or give up. If the priority of a team project doesn't seem to be higher for me, it's more of a piece of paper for other players. And because of his own as a group of teaching assistants, it is in the most intensive and busy stage, the student's problems continue, but his energy is limited, always do not take too many things.
It feels like the second stage, because of the oppression of the compilation, the team project also has a certain slack, because it is not a direct stake. I hope the whole team is working hard and I'm late for bed tonight.
"Beta phase" first scrum meeting!