For the entire 10 days, the Budget Compilation was so dizzy that day and night, and there were even no weekends. Yesterday we finished the final draft and reviewed these days, "I am only working to earn some money, but I am not trying to sell my life." "I don't pay for the money. I only pay for the job. I do not pay for the job ", this is indeed a real idea. I think that for a project, what you want and what the effect is, you have to pay as much as you think it is worthwhile, and the other party thinks it is acceptable, you don't need to worry about the process of this project, where the money goes, as long as it can meet the requirements, the failure to reach the goal will be reduced or even no money. If we can predict the entire project process, when to start a project, where to go for a business trip, and what the topic is, this project is a conventional project, rather than an innovative R & D project. It is self-evident that success can be managed based on administrative thinking.
The problem has passed. We need to review the progress and efficiency of our work during this period, and we are deeply dissatisfied with the effectiveness of our work. It is time to reflect on our performance.
1. Budget needs to be classified into sub-projects (annual.
2. List the content to be completed by the sub-project and separate the content based on the content. At the same time, you can refer to standard development procedures, requirements and research practices, which all have some standard procedures. Although software engineering is usually just a piece of paper (if copied, it is not enough time to write documents ), but it makes sense.
3. Based on the content, think about each sub-item, from the beginning to the end of the question, and think about the process. The necessary equipment, business trip, and meeting reasons will come out.
Through the above, we will first get the framework out. This work should be as detailed as possible, and it is worth some time, for example, the entire working day.
4. Next, set up the Excel worksheet and begin the compilation and budget summary. (This is a paradox. Generally, there is an amount first. In fact, this number is not an empirical value. No matter how small it is, I can write it down, because what we do is not verification, but proof of its establishment, the reason is reasonable and logical. Again ......). List all the issues.
It may take another day.
5. After the above framework is completed, we need to increase or decrease the number of projects and check the number of people.
After completing this process, it is important to check the amount. This is a very tedious and troublesome time. The so-called compilation may take another day. For example, there may be too many trips.
In this way, the budget blueprint will be well done. financial declaration is required, budget books are prepared, and research and compilation can be performed simultaneously. However, if we do not do a good job in the first step, we will rush to split the money and make a frame for our thoughts. As a result, some jobs will have to be re-launched, which lacks efficiency and requires a lot of work, very tiring. Alas!