Project Log
One, March, 3 p.m. , each knot to the group to turn in the corresponding module function analysis.
Second,3 months of the late 8 points, completed the final revision of the demand Analysis book.
Three,3 months of the late 8 , began to the overall preparation of the project specification.
Four,3 months 28-30 , according to the instructor requirements for the requirements analysis of the document to modify. Details of the changes are as follows:
Hu Xinzheng Supplement NABCD
Chishufan Supplement Four quadrants
Cheo Mengjie Complementary Smart principle
Five,3 months to eight o'clock in the evening, began to write the system outline design instructions, and the task of a division of labor:
Introduction-Cheo Mengjie
Overall design-segment extraordinary, Liu Jingwei
Interface Design-Cheo Mengjie, vcard Jie
Operation Design-Wang Xiaolin, Zhao Gang, Liu Chen Yang
System data Structure Design-Hu Xinzheng, Xiao Yang
System error Handling design-Liu Huan, practicing Yu Lin
Six, April 9 noon 12 o'clock, began the task of detailed design instructions assigned. The Function module task is written according to the knot pair group.
Announcements and Login modules-Liu Huan, practicing Yu Lin
Resource Module-Cheo Mengjie, Liu Jingwei
Job Module-segment extraordinary, Zhao Gang
Discussion Area Module-Wang Xiaolin, vcard Jay
Course Panel Module-Hu Xinzheng, Xiao Yang
Team Project-captain Log (first two stages)