As the person in charge, we should consider more things, and look at the problem from the view of overall situation and the whole project cycle. and test engineers usually just do a good job of assigning tasks, do not need to consider too many things. The following is a description of the work that should be done as a test lead from each stage of the project.
First, the demand phase
- To participate in the needs review, understand the future projects to do, do have a heart
- Be familiar with the requirements, and organize the test personnel to analyze the requirements, organize the documents and discuss with the product personnel.
Second, the development phase
- Understand the progress of development, proactively communicate with Project manager, ask for recent projects to be tested and prepare for testing.
- If there is a parallel and limited manpower, the prioritization and importance are prioritized and prioritized, and priority arrangements are headed by the leader.
- Communicate with Project Manager to develop test arrangement, which is to be measured by module or overall.
- And the project manager to communicate how to make a version, the bug has been modified after the release, or modify the part of the first version, Edge measurement side change. Encountered a fatal bug how to handle and so on.
Third, the test phase
1. Use case design
- Assigning use case design tasks
- Control Time Progress
- Organization use case Review
2. Test plan, test scheme, Test schedule development
- Allocate good resources rationally
- Use appropriate test methods, etc. according to the project situation
3. Testing
- Coordinate and build test environment
- Communication Test begins
- Do the backup and time record of the test version
4. Perform the test
- Control the project time and schedule
- Control the quality of the project
- Monitor test results, number of bugs
- Keep abreast of problems, challenges, and drive solutions
- Analysis of bugs, module bugs more to focus on testing
5. Regression test
Develop appropriate regression testing methods based on the situation
6. End of summary
- Test report
- Project Summary
In each phase of the test, the schedule should be recorded, such as: Use case design time, test time, time of each release, etc.
Iv. Period of Leisure
The above is the case of projects to do, the project is not busy, also can not be idle every day, in addition to appropriate rest, to organize
1. New technology research and sharing
2, the organization training, regarding the test aspect or other aspect and so on
What is the difference between a test lead and a test engineer in their daily work