Xxx Management Platform System project lessons
Preface
If you have nothing to do with your lessons, your experience will grow.
Technology
Aspect
In the past, there was a lack of basic selection concepts for hardware and networks, as well as a lack of overall and technical solutions for the entire system, as a result, the entire system architecture is constantly changing from the beginning of the project to the completion of system deployment.
5
The version is no less than dozens of months.
AboutDatabase
Although some preliminary research work has been done to estimate the difficulties, the difficulties in the implementation process are still insufficient. The most typical isInstall
Now
Oracle32
Bit versions make full use of system hardware resources, and
Oracle stream
Some
Bug
.
The processing of system interfaces lacks stability, robustness, and fault tolerance, and needs to be improved and summarized by system design and technical personnel.
Business
Because the first time I was engaged in this industry, I had a lack of understanding about the database and business, which led to the lack of theoretical basis when I first sought resources for reporting system requirements and communicating with the company, as a result, many misunderstandings occurred during the communication process. This is also one reason why the project was not smooth in the early stage.
When communicating with Party A, due to business reasons, Party A relies entirely on communication with the corresponding project manager, and lacks in-depth understanding of the details of various subsystems, resulting in passive overall work.
Team
Although there are differences between different people, different people are actually different in terms of teamwork, especially if the core members of the project lack the sense of teamwork, delay and increase in the progress and cost of the project, and serious adverse effects on project team building and collaboration.
For example, a subsystem is changed for personnel reasons.
3
Dial the demand investigator and change
3
Dial the project manager and change
3
Allocate developers, and focus on a project manager.
. Net
Developed by the company
Java
Project, his technical level will not be discussed; first, the system is ready to adopt
Structs + spring + ibatis
Of
B/S
Architecture.
Structs +
Spring + hibernate
Of
B/S
Architecture; lack of communication with technical experts in the project, and willingness to work hard; lack of active communication with Party A, resulting in delayed demand; unfamiliar to him
Java
But like
Java
And
. Net
For comparison.
Java
He prefers to study the technology and pursue the perfect technical framework, but his own capabilities cannot be achieved. In fact, he finally discovered hisCode
However, the lack of comments and the lack of hierarchical control of code, the most important thing is the lack of understanding and communication for their team members, the technical level of people cannot be achieved by leaps and bounds, if you don't understand it, You can pat the table and blame your team members.
4
The individual team was evicted.
5
Once a person is willing to work with him, and once the person leaves, he complains that the company does not give resources. In this respect, the company has many responsibilities, but he has no greater responsibilities on his own? Finally, he picked him out of the project team.
3
Finally, I am completely away. I believe that few people can get his temper. This person may have a good research spirit and can make good products with sufficient resources, but there is no need for team members in the project.