takes to complete or perform I/O。 Soft real-time: requires that critical processes have higher priority than other weaker processes. Realization of soft real-time requirements of self-study design dispatcher and operating system: first, the system must have priority scheduling, and the real-time process must have the highest priority. The priority of real-time p
and wait, c. Non-preemption, D. Cyclic wait2. If the allocation diagram is non-ring, then the system will have no process deadlock, if there is a ring, then there may be deadlock3. Deadlock Prevention:(1) For non-shared resources, there must be mutually exclusive conditions(2) When a process requests a resource, it cannot be contaminated with other resources(3) If a resource is occupied and another resource cannot be allocated immediately, then its
the I-cacche is also closed, and the bit[12 of the CP15 Coprocessor's SCTLR register (System control register) controls the opening and closing of the I-cache. When the I-cache is off, the CPU reads the main memory every time the command is taken, so the performance is relatively low. I-cache should therefore be opened as soon as possible. Similarly, when the system just power on, the contents of the D-cac
1. Differences between jobs and processes the concepts of processes and jobs are also different. A running process is called a job and can contain one or more processes, especially when pipelines and redirection commands are used. for example, the job "nroff-man ps.1 | grep kill | more" starts three processes at the same time. 2 process control block PCB Process status
Program Counter CPU register CPU scheduling information memory management informat
Operating System: It is a system software to manage computer system resources, control program execution, improve human-machine interface, provide various services, reasonably organize computer work flow and provide good running environment for users to use computer effectively.
Interrupt Interruption Exception exception
With the introduction of both the kernel mentality and the user state in the operating system, you need to consider how the two states are switched. The operating system kernel works in a nuclear mindset, while the user program works in User state . However, the
Tags: abstract family concept technology share strong processor picture mil INFAbstract concepts of the operating system
Files: Abstraction of I/O devices
Virtual Memory: Abstraction of main memory and disk I/O devices
Process: Abstraction of processor, main memory, and I/O devices
Virtual Memory: Provides an illusion for a process
Memory is usually divided into two areas: one for resident operating system and the other for user processes.
The operating system is not affected by user processes, and the user processes are not affected by other user processes. This protection can be achieved through the adoption of relocation registers and limit r
This article mainly describes how to correctly install the DB2 Personal Edition under the Linux operating system. If you are interested in correctly implementing the installation process of the DB2 Personal Edition under the Linux operating
. In fact, a user process is distributed in the physical memory together with other programs. In the user's opinion, the difference between the memory and the actual physical memory is achieved through address translation hardware. The logical address is changed to a physical address. This type of ing is unknown to users, but is controlled by the operating system.
Because the
When a process enters the system, it will be addedJob Queue. This queue includes all processes in the system. Processes that reside in the memory ready for running are saved inReady queueTable. This queue is usually stored in the form of a linked list. Its header node includes pointers pointing to the first and last PCB blocks of the linked list. You can add a pointer field for each PCB to point to the Next
mapping and also inherits the address returned by Mmap (), so that the parent-child process can communicate through the mapped area. Note that this is not a general inheritance relationship. In general, child processes maintain separate variables inherited from the parent process. The address returned by the mmap () is maintained by the parent-child process together.The best way to implement shared memory for a genetically-related process should be to use anonymous memory mapping. At this point
Experiment one Process Control
First, the purpose of the experiment
1. Understand the structure of the process Control block.
2. Understand the process of conversion between the various states of the process.
3. Learn how to create and undo processes.
4. Learn how process hangs and wakes up.
Second, the experimental equipment
1. Install PC for Windows or Linux operating system
2. C Program Compilation Envir
Most of the content is from a book by WB. Yang.
1. Installation Tools Required for Linux
Vim, virtualbox, G ++
2. Write your own operating system. If you are too lazy to install an input method in Linux, you have to write comments in poor English. Please bring your own lightning rod when reading.
System Boot Program: boot. s
1. code16 # compile with 16-bit Mode
Microsoft has just released a 90-day evaluation version of the Windows 8.1 Enterprise Enterprise Edition, designed for professionals in the IT industry who are looking to update their operating systems for their teams. Of course, if you just want to try this new version for Curiosity and personal reasons, it's also possible.
"This is intended for IT professionals who are interested in the Windows 8.1 Ent
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.