One, team member task completion situation
- First page design completed but need to optimize the interface, only simple output information and login on the homepage. The interface is extremely simple.
- Chicken Soup Layout design is difficult, the question is what form to manage the user's data upload, but after the discussion between the group to determine the design direction of change, the main design restart, the expected progress slowed down, need to be responsible for other interface design team members from the side to help, the temporary formation of the team hope to keep up with the pace. But because this is the group's overall agreement, the team's focus will be tilted in this section.
- The Satin section is going well, now just add the appropriate information to the database and connect to the database.
- On the slow progress of soup section, need to intensify development, but there is no major problem.
Second, Burndown chart
Three, Task Kanban
http://www.cnblogs.com/liezhihua/28%, group leader of Chi Hua
Huang http://www.cnblogs.com/huang123/26% Team
Han Kylin http://www.cnblogs.com/hanqilin/24% Team
Wang Junjie http://www.cnblogs.com/wangjunjie123/22% Team
0523 Scrum Project 6.0