1, the results of the operation results:
This alpha phase of team work is published as follows:
Table Description:
PE: Percent contribution
YS: Demo Rating (15 out of)
BK: Blog Rating (out of 15)
SH: Hindsight Link (out of 5)
P: Personal score
Personal score =0.7* Team score +0.3* Contribution ratio * Team SCORE * Team size
School Number |
Constituencies |
PE |
Ys |
Bk |
Sh |
Personal Score |
031402606 |
606notconnected |
16.00 |
13.50 |
14.00 |
4.00 |
31.122 |
031402631 |
18.00 |
13.50 |
14.00 |
4.00 |
32.256 |
031402618 |
16.00 |
13.50 |
14.00 |
4.00 |
31.122 |
031402632 |
16.00 |
13.50 |
14.00 |
4.00 |
31.122 |
031402629 |
18.00 |
13.50 |
14.00 |
4.00 |
32.256 |
031401433 |
16.00 |
13.50 |
14.00 |
4.00 |
31.122 |
031402410 |
Aruba |
16.70 |
11.50 |
13.00 |
3.00 |
27.5165 |
031402408 |
16.70 |
11.50 |
13.00 |
3.00 |
27.5165 |
031402431 |
16.70 |
11.50 |
13.00 |
3.00 |
27.5165 |
031402428 |
16.70 |
11.50 |
13.00 |
3.00 |
27.5165 |
031402429 |
16.50 |
11.50 |
13.00 |
3.00 |
27.4175 |
031402409 |
16.70 |
11.50 |
13.00 |
3.00 |
27.5165 |
031402617 |
CLover
|
5.00 |
14.00 |
15.00 |
4.00 |
26.07 |
031402615 |
20.00 |
14.00 |
15.00 |
4.00 |
34.98 |
031402612 |
30.00 |
14.00 |
15.00 |
4.00 |
40.92 |
031402338 |
12.50 |
14.00 |
15.00 |
4.00 |
30.525 |
031402614 |
12.50 |
14.00 |
15.00 |
4.00 |
30.525 |
031402339 |
20.00 |
14.00 |
15.00 |
4.00 |
34.98 |
031402230 |
TAC Tank Team |
17.00 |
12.50 |
11.00 |
4.00 |
26.2625 |
031402508 |
20.00 |
12.50 |
11.00 |
4.00 |
27.5 |
031402330 |
20.00 |
12.50 |
11.00 |
4.00 |
27.5 |
031402509 |
23.00 |
12.50 |
11.00 |
4.00 |
28.7375 |
031402224 |
20.00 |
12.50 |
11.00 |
4.00 |
27.5 |
031402324 |
Transcend |
13.00 |
12.00 |
12.00 |
4.50 |
27.7305 |
031402317 |
13.00 |
12.00 |
12.00 |
4.50 |
27.7305 |
031402310 |
17.00 |
12.00 |
12.00 |
4.50 |
30.1245 |
031402340 |
17.00 |
12.00 |
12.00 |
4.50 |
30.1245 |
031402313 |
19.00 |
12.00 |
12.00 |
4.50 |
31.3215 |
031402327 |
11.00 |
12.00 |
12.00 |
4.50 |
26.5335 |
031402140 |
10.00 |
12.00 |
12.00 |
4.50 |
25.935 |
031402412 |
Noisy Starling (NO BUG) |
16.70 |
14.50 |
13.00 |
3.00 |
30.5183 |
031402426 |
16.70 |
14.50 |
13.00 |
3.00 |
30.5183 |
031402402 |
16.70 |
14.50 |
13.00 |
3.00 |
30.5183 |
031402403 |
16.70 |
14.50 |
13.00 |
3.00 |
30.5183 |
031402401 |
16.50 |
14.50 |
13.00 |
3.00 |
30.4085 |
031402418 |
16.70 |
14.50 |
13.00 |
3.00 |
30.5183 |
031402337 |
All I'm saying is the team. |
14.30 |
15.00 |
15.00 |
5.00 |
35.0105 |
031402209 |
15.10 |
15.00 |
15.00 |
5.00 |
35.5985 |
031402342 |
14.50 |
15.00 |
15.00 |
5.00 |
35.1575 |
031402304 |
14.30 |
15.00 |
15.00 |
5.00 |
35.0105 |
031402203 |
15.20 |
15.00 |
15.00 |
5.00 |
35.672 |
031402233 |
12.10 |
15.00 |
15.00 |
5.00 |
33.3935 |
031402341 |
14.50 |
15.00 |
15.00 |
5.00 |
35.1575 |
031402517 |
It's a fire. |
3.00 |
13.50 |
13.50 |
4.00 |
23.653 |
031402515 |
14.00 |
13.50 |
13.50 |
4.00 |
30.814 |
031402505 |
23.00 |
13.50 |
13.50 |
4.00 |
36.673 |
031402504 |
14.00 |
13.50 |
13.50 |
4.00 |
30.814 |
031402524 |
14.00 |
13.50 |
13.50 |
4.00 |
30.814 |
031402511 |
23.00 |
13.50 |
13.50 |
4.00 |
36.673 |
031402516 |
9.00 |
13.50 |
13.50 |
4.00 |
27.559 |
2, Blog job scoring standard:
15 Out of
Link |
Project |
Score |
Daily (10 minutes) |
Stand-up meetings |
1 minutes per day |
Yesterday's Progress |
There is a problem |
Schedule today |
Test schedule (2 points) |
Test schedule |
0.5 |
Tool selection and Application |
0.5 |
Use case documentation |
0.5 |
Test description |
0.5 |
Summary (3 points) |
Expected plan |
0.5 |
Practical experience |
1 |
Crew Division |
0.5 |
Next stage Outlook |
0.5 |
Other |
0.5 |
3. Percentage of linear mappings
Map each student's total score from high to low linearly to the [50,100] interval, as shown in the following:
4, this homework reviews:
First, the special praise under the "I said the team" team, the team's PM is very strong, the blog beautifully written, informative, clear, and typesetting, not to give a full score of the words simply God forbid. Look at the blog there are members feeling because of the time to get, stay up time is the least, to the leader 031402304 points greatly praise, other team also reference reference this benchmark
The following is insufficient:
1, the automatic testing process is not enough attention
Many of the team's automation process is true, but the brother in the first job requirements of the second item, the clear requirements of the "sprint process to gradually expand automated testing work." However, many groups did not perform automated tests in the test session, either using manual tests instead or not testing at all. For example, in the Nobug team blog for a long while do not know how to carry out the test link, the collection of their logs did not summarize and test the link of the document, the TA said to find a good hard. The corresponding points are deducted in the test without meeting the requirements.
2. The importance of GitHub
One team finally realized the importance of GitHub in the last two days and criticized it here for a long time before, after all, the application of GitHub was emphasized. Eat a loss your wit, the elder brother to GitHub the targeted deployment of a small quiz, in the beta phase and do not travel
3. Job Page
In the team work interface, three teams did not click Submit jobs. There are two teams in the sixth team work did not submit, I would like to know if you are late submitted, at least read the blog page submission time is before the deadline, did not give 0 points, ta feel good regret.
5. Apologies
Here to everyone apologized, recently this period of time ta big history due to personal feelings caused by the results of the summary of the error delayed the team's performance summary, here self-criticism.
2016 Fuzhou University software engineering fifth to sixth team work-alpha stage Results Summary