Business trip (3~ IV)
On the fourth day of business trip, the weather turns cool, the temperature is suitable, lukewarm, especially comfortable day.
The factory also ushered in the last batch of cigarettes this year, the first two cars will be in the next time to arrive. Today the overall system operation is normal, but also exposes two problems, one is the authority problem, the current framework of the authority has been still a variety of problems, although the business has not caused serious impact, but has become a customer spit groove hot issues, need to be mastered as soon as possible in the next time. The second is to find a weighing program bug, which has been repaired before, but there is no test in place there are omissions, through the repair and re-check again, the process and repair several omissions.
In the afternoon to collect the demand in the finished product library, intends to reconstruct this part of the function, the reason for the weekend the main staff are on leave at home, about Monday to focus discussion. Then back to the conference room to the new colleagues to the system from start to finish, in this way to test the system, on the one hand familiar with the process, on the one hand to improve the function to optimize the user experience. This way before the frequent release of the time used to get good results, then interrupted, today after the walkthrough, the new colleague feedback better, it seems to be the norm later.
At night from the source code point of view of the project, weighing procedures, web-based reporting system, auxiliary tools, documents, etc., so that everyone understand the overall structure of the project, not limited to the current program, to look at the whole project from a global perspective, we need to have a forward-looking and bigger picture, through the demonstration of the next work, Weekend reasons for 8.30 points early to work, tomorrow continue.
Business trip (3~ IV)