Project Kanban:
4.1. Project Progress Board: Displays the latest status of the entire process from the on-line development and system testing, as required by the project.
Visualize, transparent and monitor the entire project operation process.
Process: creative, function, next 10 functions, development, System test, user acceptance test, on-line
4.1.1. Our Rhythm: Review summary (every two weeks), planning (every two weeks), demo and System test (continuous), release (self-determined)
4.1.2. Dealing with urgent problems and obstacles: optimizing the process flow, not filling the task board (like setting a traffic light on the road, if there is no traffic light, think about ...)
5.1. Expand the task Kanban:
Process: Next 10 functions, under development, waiting for system testing, system testing