Microsoft software tester summit is coming soon

Source: Internet
Author: User

The software industry faces a total of challenges. In China, the software industry must catch up with the world's advanced level. Testing Technology and capabilities are critical factors. Microsoft and

Industry peers share their practical experience to explore, support and contract common software testing practices, so that existing testing theories, technologies, methods, andProgramOperator

Meet the current needs of the software industry. This lecture introduces, analyzes, and explains the methods, concepts, and practical experience related to software testing.

Measure the test taker's basic responsibilities, write common test documents, common test methods and strategies, analyze Microsoft test success practices, and explore how to train Excellent Software testers.
Member.
& Lt; TD valign = "TOP" width = "89%" & gt;
Zhao qitong, testing expert at Microsoft headquarters, and lead of IE browser testing. 2000
joined Microsoft and served Microsoft Windows
the browser (Internet Explorer) Project Team of the Department. He is engaged in the development and testing of
IE6 and IE7, and is good at software testing process design and
automated testing. Before joining Microsoft, I worked as a software design engineer at summus
technologies. 1997-1998 was added to Singapore
Po Guo serves as a Bureau to develop intelligent products for the social security field. 7
years of embedded system software development experience in China in early years.

Lu Hongjie, Microsoft Senior Expert Consultant, Senior test technical expert of the Ministry of Information Industry, who has worked in Microsoft's Asian Engineering Institute and has been developing software for many years.

, Software testing and testing team management experience, has been in charge of testing of many large and complex projects, especially in the automation testing technology and test Manager

Has accumulated a lot of practical project experience. In-depth research on the key points, difficulties and implementation skills of various testing methods. Proficient in kernel space programming
Familiar with Microsoft. NET
Development. Its development and testing projects have won ministerial awards from the Ministry of Information Industry for many times.
Schedule the first day of the event

1. Software Testing Overview

(1) Purpose of software testing

(2) Characteristics of Measuring Software Quality

(3) black box test and white box test are different test methods.

(4) scientific evaluation of software testing risks

(5) Use risk assessment and optimization software testing

2.Software functional testing skills

(1) Design Test Cases Using Error Prediction and Test Techniques

(2) scientific evaluation of false guesses and test cases using white box testing methods

(3) Use Boundary Value Analysis technology to design test cases

(4) use equivalence classification analysis technology to design test cases

(5) discuss the advantages and disadvantages of various functional testing methods

3.Documents required for Software Testing

(1) Related Concepts

(2) design effective validation test cases

(3) design valid false positive test cases

(4) Write clear and operable bug reports

(5) understand the importance of status reports

4.Common Test Methods

(1) understand the practical application of common testing methods and "best practices"
(2) Improve test efficiency with various testing tools and skills
(3) discuss the advantages and disadvantages of these common testing methods

1. Automated Testing Technology

(1) Principles and basics of Automated Testing Technology

(2) What is automated testing

(3) Automated Testing controls bugs

(4) analysis of multiple automated testing tools

(5) Run Automated Testing

2.Advanced technologies and applications of Automated Testing

(1) data-driven testing

(2) Automated Testing Standards for core functions

(3) pass rate

(4)CodeCoverage check

(5) defect tracking for automated testing

(6) difficulties and solutions for GUI testing automation
(7) automation of Automated Testing

3.Test Management

(1) Does the number of bugs measure the developer's level?

(2) Classification and priority of bugs

(3) Product bug and test bug

(4) time required for fixing bugs

(5) cooperation between the test team and other teams

(6) schedule periodic testing activities

(7) evaluation criteria of testers
(8) Developing strategies for testing discipline
(9) Quality Culture
(10) Target Work System
(11) time-limited completion
(12) Data Statistics and Data Mining
(13) How to develop project plans, including development plans and test plans

(14) Reasonable work plans between milestones and milestones

(15) long-term plan, interim plan, and short-term plan

(16) ability to predict unforeseen factors
(17) Guideline and checklist
(18) How to ensure the quality and completeness of testing when the project schedule is very tight
Related Article

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.