I. plan phase ):
1.1. kickoff meeting
1.2 define the project role)
1.3 Project Plan)
1.4 hardware and software in place
1.5 organize a project risk management plan)
1.6 review the work at this stage
Ii. Construct phase ):
2.1 survey solution formulation
2.2 requirement Document Sorting
Mainly generate business requirement statement, system requirement statement, and system architecture document
2.3. Document review for this phase
3. Construct phase ):
3.1. System Configuration
This stage mainly includes the establishment of the development environment, finalization of the UI design, and finalization of the site structure.
3.2 System Development
Development and code review
3.3 Document Sorting
Mainly generate system design specifications and system interface design documents.
3.4 prepare the next phase plan
Mainly develops user operation manuals, system test plans, UAT test plans, and stress test plans.
3.5 code review and document review for this phase
4. Test phase ):
4.1. system testing, UAT testing, and stress testing
4.2 various tests mainly include writing test cases, executing tests, and writing test reports.
4.3 launch user training
Including management personnel and business user training
5. Deploy Phase ):
5.1 install and deploy the manual
5.2 installation of software and hardware in the production environment and system software deployment
5.3 launch and run
5.4 go to Happy! Required ~~
Vi. Project Summary
6.1 project members should write summaries, conference presentations, and how to inherit from the excellent links of the project, and how to avoid the weak links in the future.
6.2 material rewards are given to employees who have performed well in the project.