Issue background:
Now, in the company, like a professional handyman, from a number of projects in the middle of the journey, in different problems shuttle. I began to nostalgia, study, a few daily papers, experience a little bit of the day, maybe that day to me more full.
When faced with every day of the interface ·, the time is constantly scattered, and then scattered.
the condition of the study:
At that time, study more silly, really he thought he would do something, read papers, take notes, do instant stickers. Track your progress, what progress, theoretical progress? The progress of the experiment? To graduate, other people, I wipe, a copy can graduate, silly forced me.
However, there is still a harvest. Is that when you are mentally retarded, you can break up the problem and follow it.
Project Management:
The use of conventional project management tools, such as "Jira", the Domestic "Zen Road", are similar to the directory management, or wiki way, the directory tree as the core.
Problem Scenario:
However, to do so, there are some problems, that is, when the problem is more planning, it is possible to do so, a tree hierarchy. However, I work every day, they are self-control, not the master, can only be similar to the problem-solving model to promote.
At this time, some tools may be more appropriate. Like Sticky notes. Later on the Internet to find the tool--leangoo. The pattern with the Swimlane graph.
My general mode, divided into four lanes: "To do" "doing" "done" "conclusion".
Maybe the next wiki way, a little better.
Track project progress or problem resolution with Swimlane diagram tools