The predecessor of the cmme model is SW-CMM and SE-CMM, the former is what we refer to CMM. The main difference between cmme and SW-CMM is that it covers many fields; so far it includes four areas:
1Software Engineering (SW-CMM)
Software Engineering is intended for the development activities of software systems and requires systematic, systematic, and quantified software development, operation, and maintenance activities.
2System Engineering (SE-CMM) System Engineering targets the developmen
practices for describing valid process features
1. The process model emphasizes "effective", while the process can be mature or immature.2. The process model is a structured set, but the process does not require structuring.3. The process model does not require the sequence, but the process is a sequence set.
12. Is cmme a process or a process model?
Cmme is a process model.Because:• All its practices are effective and are summed up by previous experiences.• It is a structured set.
13
pa lists the requirements for team management, such as building a project vision and building a team. The Oei PA lists the requirements for team management at the organizational level, for example: establish decision-making bodies and formulate code of conduct at the organizational level. Cmmiv1.2, the two PA have been "gone", the two PA content has been integrated into IPM (integrated project management) and OPD, OPD (organization process definition, organizational process definition) the SG2
encounter loveStatus. The SEI Evaluation Program sets additional requirements for training for those who are not currently members of the Evaluation Team. Those who have been trained as members in the previous evaluation team, if notFor the current method training, they are not automatically qualified to participate in the current evaluation. In such cases, the evaluation team leader asks for an understanding of the nature of previous training and training for the coming evaluation.Enough conte
Let's take a look at the differences between CMMs and CMM. The main difference between cmme and SW-CMM is in three aspects: professional field, maturity level, process domain, model structure. Compared with CMM, cmme covers four specialized fields: Software Engineering (SW), System Engineering (SE), integrated product and process development (ippd), and procurement (supplier sourcing ). The origins and origins of IPD and cmme determine the great diffe
products, and then integrate the products into the development work to meet the contract.
Integrated Project Management
Integrated project management (IPM) is a progressive process domain that adds enhanced capabilities to other project management process domains. The following targets belong to IPM.
SG1: An organizational process defined
SG2: coordination and collaboration among stakeholders
SG3: Application of ippd principles
The first goal is to
procurement. Taking more than one model at this point can make many key process domains overlap and increase development costs.
November 2001 SIE introduced CMMI V1.1, integrated the above model to solve the overlapping problem between multiple models. At the same time SEI published a set of evaluation systems for CMMI SCAMPI SM V1.1, replacing the CBA IPI and SCE SM and intended to replace the CMM with CMMI. Many organizations have already begun to transition to CMMI.
The CMMI's underlying s
Contact Us
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.