Source: PLM 412 quanlity Planning
I can do it again today. I only got one error. If you have any questions, you are probably right.
1. The plan usage is stored in the inspection plan header.
Determine whether this statement is true or false.
□True
□False
2. Materials, vendors, and customers can be assigned using the inspection
Plan header.
Determine whether this statement is true or false.
□True
□False
3. A work center can be assigned to the operation in the task list.
Determine whether this statement is true or false.
□True
□False
4. Test equipment can be assigned directly to an inspection characteristic in
Inspection Plan.
Determine whether this statement is true or false.
□True
□False
5. documents can also be assigned as test equipment/Production
Resources/tools.
Determine whether this statement is true or false.
□True
□False
6. the test equipment used can be inspected regularly.
Determine whether this statement is true or false.
□True
□False
2006/Q2 2006 sap ag. All Rights Reserved. 261
Test your knowledge plm412
7. dependent characteristic specifications can also be entered for referenced
Master inspection characteristics.
Determine whether this statement is true or false.
□True
□False
8. dependent characteristics can be used in an operation.
Determine whether this statement is true or false.
□True
□False
9. The control indicator for inspection characteristics can always be changed
In the task list.
Determine whether this statement is true or false.
□True
□False
10. Several materials can be inspected with one inspection plan.
Determine whether this statement is true or false.
□True
□False
11. You can use a reference operation set as a copy model for creating new
Inspection plans.
Determine whether this statement is true or false.
□True
□False
12. The operations from the inspection plan and the reference operation set are
Displayed in the product structure.
Determine whether this statement is true or false.
□True
□False
13. The engineering workbench cannot be used to process reference operation
Sets.
Determine whether this statement is true or false.
□True
□False
262 2006 sap ag. All Rights Reserved. 2006/Q2
Plm412 test your knowledge
14. mass change is possible in the engineering workbench at both operation
Level and characteristic level.
Determine whether this statement is true or false.
□True
□False
15. The work area is used to define which areas are offered as selection criteria
On entering the workbench.
Determine whether this statement is true or false.
□True
□False
16. Inspection characteristics are connected to Engineering Change Management
As objects.
Determine whether this statement is true or false.
□True
□False
17. By using Engineering Change Management, different validity statuses can
Exist for an inspection plan.
Determine whether this statement is true or false.
□True
□False
18. The change master record can be structured in such a way that changes can
Only be made to inspection plans, but not to materials, with one change
Number.
Determine whether this statement is true or false.
□True
□False
19. It is not possible to carry out an inspection according to specifications from
An inspection plan and a material specification.
Determine whether this statement is true or false.
□True
□False
2006/Q2 2006 sap ag. All Rights Reserved. 263
Test your knowledge plm412
20. The material specification can supplement the specifications from
Inspection Plan.
Determine whether this statement is true or false.
□True
□False
21. The specifications from the material specification are attached to the last
Operation in the inspection lot.
Determine whether this statement is true or false.
□True
□False
22. Flexible inspection characteristics can be used at inspection lot creation.
Determine whether this statement is true or false.
□True
□False
23. The use of flexible Inspection specifications is linked to an authorization.
Determine whether this statement is true or false.
□True
□False
24. The flexible Inspection specifications function is not always available in
The standard system.
Determine whether this statement is true or false.
□True
□False
25. You can include multiple specifications in all task lists.
Determine whether this statement is true or false.
□True
□False
26. The multiple specifications can be used in the complete inspection process.
Determine whether this statement is true or false.
□True
□False
264 2006 sap ag. All Rights Reserved. 2006/Q