User feedback: OK.Number of users: 4Team Improvement advice: thinking is too limited, technology needs innovation.1. what needs to be improved in the first sprint phase of each member ?
Member NBSP;
need to improve Shaowen
need to mention High productivity, ability to innovate, ability to solve problems
Li Xin
Learn a little more knowledge
Chen Junqin
part of the sixth assignment according to the progress of the project
Learn the UML Diagram and the building method to learn about the tools required for blogging and design.
problems encountered: a database field with a length exceeding the limit error causes an insert exception, and some hidden bugs require multiple tests to discover. When you join a group, the request fails, and there is no error returning information that needs to be parsed from the logical layer of the code.
Complete and publish Summary blog, sixth chapter of building Law, learning UML diagram
Wu Jingan
Unit testing of completed functions
Improve the test results of completed functions, design test cases for the function of the next step plan implementation of the meeting
Hu Zhiquan
Complete part of the sixth assignment according to the progress of the project
Learn UML diagrams, Learn the tools your blog and design requires.
problems
Goal of the first sprint: to achieve basic tasks and lay the groundwork for a second phase of sprint
The first stage sprint actually completes the task: has basically achieved the sprint target, but the existence of the shortcut key conflict problem unresolved, did not realize the corresponding function related to t
After the second stage of the sprint, we have a further improvement in the original function, and added a Notepad function, can basically realize the user's text input, save and modify, and can remind the user time, the alarm plate is mainly able to set the time, timing reminders, Prompt time can be selected from Monday to Friday, as well as the sound of the alarm clock can be selected from the phone's SD card, all rely on the cooperation between team
mainactivity is a main class that inherits from the flashlight class. An inherited list of three nodes is formed at this time. The Baseactivity class is mainly used for initialization;Today's task: realize the dynamic layout of flashlight;Tomorrow's goal: to achieve the dynamic layout of the flashlight;5.12Yesterday completed: Activity_main.xml modified, the use of the framework layout, control the level of display, to achieve the effect of overlay display;Today's task: realize the dynamic layo
integration testing of completed functions, and completion of part sixth assignments based on project progress
Improve the test results of completed functions and design test cases for the function of the next step plan implementation
problems encountered: ① Registration can choose the function of identity, the foreground need to capture the parameters in the page and pass to the background, and then backstage through Controller,serverimp and Dao layer to make the correspondin
The second day report (11.3 week five)Team: Java-teamMembers:Zhang Huiyu (284)Wu Jingan (286)Chen Yang (pm:288)Han Huasung (142)Hu Zhiquan (143)GitHub Address: Https://github.com/WHUSE2017/Java-TeamServer address: http://125.220.159.167:8080/jeesns-web/
Team meeting
Time
2017.11.3 20:00-20:30
Form
Group Discussion
Members
All Members
Summary
Today's summar
I. Problems in the development process of the previous period1. The font color white, in the background is not obvious.2. There is a "20122888 hello" in the upper left corner, looks very ugly, want to remove.3. There is a conflict between the personal centre and the lending situation, which overlaps and removes the personal centre.4. When you exit the homepage, you do not cancel your account, you can use the return button to return to the interface.5. The interface is not beautification, the que
5.26Before completion: Flashlight basic ability to achieve;Today's mission: the design of the main interface;Problems encountered: In an activity to achieve the interface of the jump;5.27Completed yesterday: Design of the main interface;Today's mission: The design of warning lights;Problems encountered: In multi-threaded access to the view, warning lights alternately flashing;5.28Completed yesterday: The design of warning lights;Today's mission: The design of the Morse code module;Problems encou
Improve the test results of completed functions and design test cases for the function of the next step plan implementation
problems encountered: the expression can be displayed when the input is selected but the output is displayed as a string.second, the Project Burndown chart Increased the ability to find people that were not intended to be implemented, so the Burndown chart curve did not change. The expression function is also in the implementation.By number of CardsThird, cod
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.